|
|
|
|
Configures the time ( in seconds ) the workstation must wait before launching the first image. The delay is initiated after the exposure head has completed initializing.
|
|
| A "cold" exposure head requires time to allow the beam-pointing to stabilize. Note that the beam-pointing uses a non-switched power supply and thus a safety fault ( and the resulting loss of the laser power supply ) will not affect the beam-pointing stabilization.
|
|
| Although the workstation is prevented from launching images, test plots and monitor commands are not prevented from launching images and / or enabling the laser. The exposure head will return an error for test plots and monitor commands ( typically for failing to detect the laser ).
|
Integer
|
5 Seconds
|
0 to 65535 Seconds
|