| |
Installation
Item |
Complete |
| 1. |
Site
Preparation |
|
| 2. |
Hardware
Installation |
|
| 3. |
Check for Damage |
|
| 4. |
Remove the Imagesetter |
|
| 5. |
Open Imagesetter Doors |
|
| 6. |
Level the Imagesetter |
|
| 7. |
Fit the Inline Processor
(Optional) |
|
| 8. |
Remove Shipping Safeguards |
|
| 9. |
Select Film Path |
|
| 10. |
Electrical Connection |
|
| 11. |
Host Connection |
|
| 12. |
Power On |
|
| 13. |
Software Version Check |
|
| 14. |
Start Operation |
|
| 15. |
Insert the Interlock Keys |
|
| 16. |
Load the Film Cassettes |
|
| 17. |
Update Media Information |
|
| 18. |
Imagesetter Check |
|
| 19. |
Empty Imagesetter Drum |
|
| 20. |
Restart the Imagesetter |
|
| 21. |
Close Imagesetter Doors |
|
| 22. |
Load New Film into Drum |
|
| 23. |
Check Laser Intensity |
|
| 24. |
Perform Regular Unload |
|
| 25. |
Process Film |
|
| 26. |
Examine and Set Laser Intensity |
|
| 27. |
Expose Internal Pattern |
|
| 28. |
Examine Overall Film Quality |
|
| 29. |
System Configuration |
|
| 30. |
Configuration on the Host |
|
| 31. |
Test Exposure from the Host |
|
| 32. |
Attach translated labels (if
relevant) |
|