![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Description To improve the centering system reliability by changing the centering motor assembly.
|
Prepared By: Zion Zluf |
FCO Kit No: 510F27343 |
|
Comp. Level: |
Machine S/N: |
|
Catalog No: 507A1L837A |
S/W Affected: |
|
Type of Change: Mandatory |
Total Number of Pages: 3 |
|
Product Mgr: Nir Halup |
Approval Date: 31-JUL-2001 |
|
Product Support: Itai Peperovich |
Approval Date: 26-JUL-2001 |
|
Customer Support Mgr: Assaf Zach |
Approval Date: |
1. Reason For Change
2. Description of Change
Replace the pin in the centering motor sprocket assembly with a 2 (mm) dowel pin.
3. Change Procedure

Note: Mark the centering system location, to ease connection later.

Note: Before releasing the motor assembly, move the short pins to the edge of the centering system. This will ease installation later. (Picture 4).

Note: Make sure the chain is tensioned before tightening the screws.
4. Test Procedure
5. Parts List
| PART | QTY | DESCRIPTION |
| 374A00080 | 1 | PACKING LABEL-WHT |
| 507A1L837A | 1 | CENTERING MOTOR ASSY |
| !FCO-DOC | 1 | FCO DOCUMENT |
6. Attached Documentation
None.
7. Material Disposition
8. Logistics
Approved quantities:
|
CSA |
: |
40 |
|
CSE |
: |
50 |
|
CSAP |
: |
8 |
|
CSN |
: |
11 |
|
CSMA |
: |
5 |
|
Other |
: |
|
| No Limit |
8.2 Schedule supplies for first lots
|
D.U |
Month |
QTY |
Month |
QTY |
Month |
QTY |
|
|
CSA |
: |
August |
10 |
September |
20 |
October | 10 |
|
CSE |
: |
August |
10 |
September |
30 |
October | 20 |
|
CSAP |
: |
August |
2 | September | 3 | October | 3 |
|
CSN |
: |
August |
3 | September | 5 | October | 3 |
|
CSMA |
: |
August |
1 | September | 2 | October | 2 |
|
Other |
: |
8.3 Inventory in warhouses:
Dispose of the old motor assemblies.