![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
This procedure consists of three steps:
Procedure
- Prior to reinstalling the upper gripper actuator assembly, make sure the area of the gripper assembly is clean and clear of any parts.
- Slide the upper gripper actuator assembly into the optomech.
- Check that the enable detector is correctly connected.
- Connect the air tubes to the air cylinder. Make sure that you connecting in and out tubes accordingly.
- Reconnect the Molex connector of the detector cable.
- Connect the compressed air supply to the platesetter.
- From within Lotem Controller, open the drum motor_dlg.
- Send the drum to the load gripper location (approx. " - 790") (Registry Loading System"Unload head gripper position").
- After the drum reaches this position, activate the load gripper valve and check that the actuator pins are in the middle of the head gripper groove.
- Power off at the drum motor_dlg (within Lotem Controller),read the position parameter on the motor_dlg and check if it is diffrent from the parameter of that in the registry.
- Perform a loading and exposure sequence to verify that the loading/unloading process is working correctly.