Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Purging the Air Supply in the Lotem 800

To purge the air supply:

  1. In the GUI, move the carriage to position 200, as follows:
    1. Select Utilities > Hardware.
    2. In the displayed Hardware tree, double-click Expose System > Carriage System > Carriage Motor.
    3. In the Operation tab of the Carriage Motor dialog box, select Position and type 200 in the Position field.
    4. Click Start.
  2. In the GUI, activate the lens air valve, as follows:
    1. In the hardware tree (under Expose System), double-click Laser System > Lens Air Valve.
    2. In the Operation tab of the Lens Air Valve dialog box, click Start.
    3. Allow the air to circulate for at least five minutes in order to clear all accumulated moisture and dirt from the system, and then click Stop.
  3. Activate the Cassette In and Cassette Out air valves, as follows:
    1. In the hardware tree, double-click Loading System > Loading Plate to Drum > Solenoids/Valves > Cassette Inside Air Valve.
    2. In the Operation tab of the Cassette Inside Air Valve dialog box, click Start.
    3. Allow the air to circulate for at least five minutes in order to clear all accumulated moisture and dirt from the system, and then click Stop.
    4. In the Cassette Inside Air Valve dialog box, select Cassette Outside Air Valve from the Switch drop-down menu and click Start.
    5. Allow the air to circulate for at least five minutes in order to clear all accumulated moisture and dirt from the system, and then click Stop.
  4. The air supply is purged. Close all dialog boxes.


Popups / Tool Tips for this Page

   Close this popup...   To blah-de-dah:


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.