What's New For Lotem 800 Quantum Spectrum Version 3.50.07
This document describes changes made to the Lotem 800 Quantum Spectrum software
in version 3.50.07 relative to version 3.50.06
Important Notes:
This controller version requires the following firmware files to be loaded
in the TMCE board and Thermal Head 2:
TMCE firmware: 1.18-01 (QuantumFmwRelease118-01.bin)
Xilinx firmware: 1.05 (mcelca0105.bin)
Head firmware: 1.00C (th2h100c.bin)
Pattern Data: 1.01 (mcedata.bin)
Boot Code: 1.09 (mceboot.bin)
Information about software versions loaded in the TMCE and TH2 can be obtained
by typing the following commands (through SPlot or Service Shell):
QUANTUM>> fw dir (or: list version all)
QUANTUM>> th2 "ver"
In addition, the following calibration script should be used:
Media Calibration Script: 0.9 (QuantumSeries.spt)
The proofing media unloading sequence improvements introduced with this
new version require an adjustment of the proof unloading arm end position
detector. Please see issue (5) below under the section "Synchronization
of Drum & Unloading Bar" to better understand the roles of the proof
unload arm end position detector in the unloading procedure.
Bug Fixes:
There were certain circumstances in which the balancing operation would
not be performed for proof expose. For example after opening and closing the
rear door. Not doing the balancing operation automatically would lead to a
vibrating machine during expose and/or to expose failure. This is especially
important to support the new Brisque resubmit functionality, which one usually
operates after expose failures and door openings.
When loading a plate while a carrier is still on the drum, the plate is
brought to drum entry and then carrier unloading is supposed to begin. But
the carrier unloading was performed only if two conditions were met: the parameter
UnLoad Plate under the EXPOSE registry section is TRUE, and the unload flag
of the plate expose job in the Brisque is TRUE. So, if at least one of these
parameters was FALSE, the carrier would not have been unloaded and the plate
load (and expose) would fail with an error of Illegal loading system state:
Proofing media is on the drum.
New features:
Improved proof media unloading reliability:
Synchronization of Drum & Unloading Bar:
During donor/receiver peeling from the drum, the drum needs to start moving
together with the retraction of the proof unload arm in order to allow
smooth detachment of the media away from the drum. These two motions were
previously synchronized by a timeout value, but currently the trigger
for the drum motor to start moving is the proof unloading arm end position
detector switching to OFF state, signaling the arm physically detached
from the drum. In case the detector did not change to OFF state within
500 milliseconds from the proof unloading arm retraction command, a warning
will be displayed on the screen and the unloading process will continue.
Unload Tray Detector Polling:
After the proof unloading arm peeled the donor/receiver from the drum,
it shuts off its suction cups and the media lands down on the unloading
tray and on the Plate On Unload Detector. Previously there was a two seconds
wait and then the state of the detector was read - ON meaning the media
was peeled successfully, OFF meaning failed attempt. Currently, the detector
is constantly polled after switching off the suction cups, waiting for
the detector to turn to ON state. If after ten seconds there was no ON
reading, then the donor/receiver is pulled back to the drum for another
peeling try (up to a maximum of 6 tries).
Ironing After Each Failed Peeling:
After each failed peeling attempt, the donor/receiver are now ironed again
onto the drum using the unload roller, before re-attempting their unload.
Shutting Off Drum Vacuum For Receiver Peeling:
The drum vacuum pump is now switched off for receiver unloading during
the sixth and last unload attempt in case of previous receiver unload
failures. This is happening while the arm is pressing the receiver against
the drum, immediately before it is retracted up to peel it. A certain
drum vacuum threshold is waited for before continuing with the peeling
process.
Added new parameter for drum speed when unloading a carrier: Drum Motor
Speed To Unload Carrier (mm/sec), with default value of 45 mm/sec, under \Loading
System\Unload Proof\Drum Motor. This slower drum speed is needed especially
in Quantum machines due to their much faster default drum speed in media unloading.
Added a script that enables to cycle test the proofing media unloading
reliability. It can be found in C:\Lotem\Lotem800\Scripts\Testing\ UnloadReliabilityTest.Script.
Added the latest TMCE firmware (version 1.18-01, file name: QuantumFmwRelease118-01.bin)
and calibration tests file (version 0.9, file name: QuantumSeries.Script)