Before unpacking the crates, walk through the site to ensure that all the necessary preparations have been made.
- plant air supply
- dedicated phone line for workstation communications
- network connection
- AC power
- floor flatness
- environmental conditions
- location of the Trendsetter VLF: is there enough space to add the AL options? are the air/power/telephone lines easily accessible?
- service access clearance around the entire Trendsetter VLF system
- location of workstation
- area for plate storage
- location of processor, and clearances
- area for plate stacker or plate puncher, if applicable
Verify the future system configuration with the customer (SCU or MCU,
conveyor type, system orientation, etc).
Verify the size and type of plates that the customer will be imaging,
and the type of processor.
- fork width not exceeding 6" (15cm)
- lateral fork movement capability is recommended
Supplied by Customer
The following heavy moving equipment must be arranged with the customer:
- forklift -- to move the Trendsetter VLF (1800 Kg / 4000 lbs)
Two lifting bars and an adjustable foot wrench will be shipped with the Trendsetter VLF.
The customer must also supply a floor layout diagram (from Site Preparations & Requirements document 73-3319A).
Supplied by Creo CSE
- Two or three 1/2" sockets with handles (for opening crates) or a cordless drill with 1/2" socket
- Completed site preparation checklist (from Appendix A of Site Preparations & Requirements document 73-3319A).
- Thermal Head Installation Procedure 77-0074A
- Service Engineer's toolkit 90-1005A (including multimeter, grounding wrist strap, etc)
- Lifting jacks (92-0084) to remove the castors
- Air Supply Test Gauge (92-0373A)