Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Unpack the AL-Ready Trendsetter VLF

  1. Inspect all delivered crates and boxes. These will normally be located in the customer's loading dock area.
  1. Record any problems immediately on the Installation Report form and report them to both Creo and the Delivery Company.
  2. Unpack the Trendsetter VLF.
  1. Open the crate to allow access to the front and rear of the machine.
  2. Remove all packages from the crate:
  • adjustable foot wrench
  • fasteners
  • guard rail assemblies (2) including base plates and struts
  • lifting bars
  1. Remove the temporary table supports.
  2. Remove the front center panel and both rear panels.
  3. Raise the hose cage to gain access to the forklift rails.

WARNING!  Moving the Trendsetter VLF by forklift when its front and rear panels are still on will damage the machine.

  1. Have the forklift operator remove the Trendsetter VLF from the crate. Lift it carefully as one side is heavier than the other. The machine can either be placed on the floor for rolling on its castors, or be moved by forklift directly to its permanent location.
  1. Unpack the workstation.
    Move the workstation components to their permanent location using a dolly or pallet jack.

Note:  Do not unpack the workstation until you are ready to install it.

  1. Unpack the imaging head.
    Leaving the head in its crate, move it to its permanent location using a dolly.

Note:  Do not unpack the imaging head until you are ready to install it.


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.