Unpack for a Field Upgrade

  1. Inspect all delivered crates and boxes. These will normally be located in the customer's loading dock area.
  1. Record any problems immediately on the Installation Report form and report them to both Creo and the Delivery Company.
  2. If space is tight, consider the best sequence in which to install the components before starting to unpack the crates.

Note:  Do not clutter the workspace.

  1. Unpack the conveyor first.

Straight Conveyor

  1. Dismantle the crate sides and top.
  2. Have the forklift operator remove the conveyor from the crate. It can either be placed on the floor for rolling, or be moved by forklift directly to its permanent location.
  3. Leave the foam pad covering the plate deck in place. Small items from the other crates can be stored on it.

L-Conveyor

not yet available

  1. Unpack the cassette cart (part of the Single Cassette Unit).
  1. Remove the crate top and one side only.
  2. Cut the tie straps holding the cart to the crate.
  3. Have the forklift operator remove the cart from the crate. It can either be placed on the floor for rolling, or be moved by forklift directly to its permanent location.
  4. Leave the foam pad covering the plate deck in place. Small items from the other crates can be stored on it.
  1. Unpack the AL Upgrade Kit for the Trendsetter VLF.
  1. Remove the crate top.
  2. Remove and unwrap all packages from the crate and put most of them on the conveyor's foam pad or in a cassette (if ordered):
  • adjustable foot assemblies (2)
  • adjustable foot wrench
  • counterweight addition
  • counterweight dampers (2)
  • electrical cables
  • fasteners
  • floor plate (SCU only)
  • Genine board
  • guard rail assemblies (2) including base plates and struts
  • hood with p-door and y-axis (leave in crate)
  • picker with skins
  • pneumatic upgrade hoses and fittings
  • pneumatic upgrade table vacuum
  • rear access guards (3 rear and 2 sides)
  • table extension assembly (leave in crate)
  • table filler strip and external ribs
  • table leading edge
  • table upgrade panels (4)
  • track skins (3)
  • track support arms (2)
  • track support arm spacers (3 pairs)
  • user interface delete panel
  1. Unpack the track.
  1. Remove the crate top, but do not remove the track from its crate.
  2. Discard any excess packing material.
  3. Lift the crate by hand onto dollies and roll it to its permanent location.

Note:  Do not unpack the track until you are ready to install it.

  1. Unpack the garage (part of the Single Cassette Unit).
  1. Remove the crate top and sides.
  2. Remove all packing material.
  3. Remove the temporary fasteners securing the garage plate to the bottom of the crate.
  4. Leaving the garage on the crate bottom, move it to its permanent location using a pallet jack.
Note:  Do not take the garage off the crate bottom until you are ready to install it.
  1. Unpack the Multiple Cassette Unit.
    Not yet available.
  2. Unpack the Slipsheet Removal Unit.
    Not yet available.
  3. Unpack the Autoloader toolkit (#04-0018A).
    Roll the toolkit box to the location of the installation on its castors.