Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Planned Maintenance Procedure - MCU with Straight or L Conveyor

Strictly confidential, for internal use only. If you print the checklist out, be careful not to leave it at a customer site.

Planned maintenance (PM) is to be performed only by Creo service personnel or by trained and certified operators.

To print out the PM instructions below, click on the print icon at the top of the page.

This is a continuation of the PM procedures. For the previous steps in the PM, see the Main PM Procedure.

Slip Sheet Removal (SSR) | Straight Conveyor | L-Conveyor

Multiple Cassette Unit What to Do What to Look For Procedure

Parts

  **Open the cassette doors and remove the rear service panel.**
e-stop switch Depress the switch. Check that the picker lights are off and that the workstation message is correct.  
Genine 1 Visually inspect the lights on the board.    
PDB Visually inspect the lights on the board.    
MCU safety board Visually inspect the lights on the board.    
Carriage driver board Visually inspect the lights on the board.    
Lubricator Visually inspect the automatic luber. Replace as required.    
Cassette lift leadscrew Lubricate.    
Cassette lift leadscrew belt Visually inspect the condition, alignment, and tension of the belt.    
Manifold Inspect the manifold assembly for leaks and overall condition.    
Cassette doors Visually inspect. Check for smooth and symmetrical operation.  
Cassette to plenum height Check the distance with the verification tool at both ends of the plenum on all four cassettes. Record the dimensions.    
Cassette limit switches Check the position and operation of both switches.    
Chariot Check the chariot height.    
  **Run a load sequence on all cassettes.**
Chariot lock actuators Check both actuators for leaks and alignment.    
Chariot position sensors Check the condition of the floating sensors.    
Chariot latches Visually inspect. Check for smooth movement and positive engagement on all cassettes.  
Chariot latch sensor Check the condition of the latch sensor.    
Media position Check that media is being centered. There should be a 1-2mm gap between the media edge and the side and rear guides. Check for slip sheets being pinched.  
Reflective tape Check that tape is intact in all cassettes. Replace as required.    
Slip Sheet Removal Unit      
Rollers Check for excessive wear and smooth operation.    
Roller preload Check the alignment of the two rollers.    
Roller shield Check the clearance between the rollers and shields.    
Roller actuators Check for leaks and loose fittings.    
Roller drive Check the alignment between the roller and the motor.    
Manifold Inspect the manifold assembly for leaks and overall condition.    
Compactor Check for smooth and quiet operation.    
Straight Conveyor      
Genine 4 Visually inspect the lights on the board.    
Belts Visually inspect the condition and tension of each belt.    
Speed Ensure that the conveyor matches the processor.    
L Conveyor      
Genine 4 Visually inspect the lights on the board.    
Carriage driver board Visually inspect the lights on the board.    
Manifold Inspect the manifold assembly for leaks and overall condition.    
X-axis Check for smooth operation.    
X-axis belt Visually inspect the condition and tension of each belt.    
Y-axis Check for smooth operation.    
Y-axis belt Visually inspect the condition and tension of each belt.    
Rotator Check rotation angle.    
Rotator vacuum      
Rotator vacuum generator filter Remove and inspect the filter. Replace as required.    
Lift Check for smooth and symmetrical operation.    
Speed Ensure that the conveyor matches the processor.    
**Continue with the Workstation, Service Comments, and Customer Acceptance steps in the PM.**

    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.