![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
To print out the PM instructions below, click on the print icon
at the top of the page.
This is a continuation of the PM procedures. For the previous steps in the PM, see the Main PM Procedure.
Single Cassette Unit (SCU) | Slip Sheet Removal (SSR) | Straight Conveyor | L-Conveyor
| Autoloader | What to Do | What to Look For | Procedure
Parts |
|
|---|---|---|---|---|
| Single Cassette Unit | ||||
| **Remove the side panels and power box cover.** | ||||
| Genine 1 | Visually inspect the lights on the board. | |||
| PDB | Visually inspect the lights on the board. | |||
| Carriage driver board | Visually inspect the lights on the board. | |||
| Manifold | Inspect the manifold assembly for leaks and overall condition. | |||
| Cassette doors | Check for smooth and symmetrical operation. | |||
| Cassette to plenum height | Check the distance with the verification tool at both ends of the plenum on all cassettes. Record the dimensions. | |||
| **Run a load sequence on all cassettes.** | ||||
| Cassette/cart latch | Check for smooth and positive engagement on all cassettes. | |||
| Cassette/cart casters | Check for wear and loose fasteners. | |||
| Cassette cover | Check for smooth operation, light tightness and overall condition. | |||
| Media position | Check that media is being centered. | There should be a 1-2mm gap between the media edge and the side and rear guides. Check for slip sheets being pinched. | ||
| Reflective tape | Check that tape is intact in all cassettes. Replace as required. | |||
| Slip Sheet Removal Unit | ||||
| Rollers | Check for excessive wear and smooth operation. | |||
| Roller preload | Check the alignment of the two rollers. | |||
| Roller shield | Check the clearance between the rollers and shields. | |||
| Roller actuators | Check for leaks and loose fittings. | |||
| Roller drive | Check the alignment between the roller and the motor. | |||
| Manifold | Inspect the manifold assembly for leaks and overall condition. | |||
| Compactor | Check for smooth and quiet operation. | |||
| Straight Conveyor | ||||
| Genine 4 | Visually inspect the lights on the board. | |||
| Belts | Visually inspect the condition and tension of each belt. | |||
| Speed | Ensure that the conveyor matches the processor. | |||
| L Conveyor | ||||
| Genine 4 | Visually inspect the lights on the board. | |||
| Carriage driver board | Visually inspect the lights on the board. | |||
| Manifold | Inspect the manifold assembly for leaks and overall condition. | |||
| X-axis | Check for smooth operation. | |||
| X-axis belt | Visually inspect the condition and tension of each belt. | |||
| Y-axis | Check for smooth operation. | |||
| Y-axis belt | Visually inspect the condition and tension of each belt. | |||
| Rotator | Check rotation angle. | |||
| Rotator vacuum | ||||
| Rotator vacuum generator filter | Remove and inspect the filter. Replace as required. | |||
| Lift | Check for smooth and symmetrical operation. | |||
| Speed | Ensure that the conveyor matches the processor. | |||
| **Continue with the Workstation, Service Comments, and Customer Acceptance steps in the PM.** | ||||