Suggested action |
|
- Confirm that verbosity is not set too high. Verbosity should only be increased during troubleshooting and should be disabled afterwards.
Note: Try not to increase the verbosity of multiple subsystems at a time.
- Update the bpd holdcurrent. Type:
TH2 >bpd mode on
TH2 >ldd mode current 18
- Wait for 1 minute. Type:
TH2 >bpd mode update
TH2 > laser off
- Update the ldd calibrate. Type:
TH2 > bpd mode on
TH2 > lvd mode local
TH2 > ldd calibrate
You will see the following:
Turn on the laser (Y/N)?
Type: y
Y-Intercept=5.9254 Amps, Slope=1.815 Amps/Watt
*** Command Success ***
The beam-pointing has settled!
- After the command completes, type:
TH2 > laser off
- Run
beambalance.spt and inspect for any areas with reduced margin for beam balance.
- Run
contrvhv.spt and set hvtrim for the minimum leakage.
- Run
contrvbp.spt and confirm the minimum leakage beam position.
- Run
beambalance.spt again and confirm any changes that have improved the beambalance result.
|