Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Site Planning Workflow
Network Environment - Airconditioning


The air-conditioning must be specifically designed for this purpose.

  • The air-conditioning should be able to cool the site for any outside temperature.
  • The air-conditioning location should allow suitable air flow circulation.
  • It is recommended to plan a redundancy system for the air-conditioning system in the communication room.

It is recommended that the communication room should maintain an average temperature of 21°-23° ± 10%.

The humidity inside the communication room should be 50% (± 10%).

  • NOTICE:
    Do not use a desert cooler (air cooling by water) because desert coolers are designed to raise the humidity in a dry environment.
  • Do not use in the communication room air-conditioning of the COMFORT type.
  • To decide on the required air conditioning it is necessary to calculate the total BTU of all devices located inside the communication room.
  • The air conditioning must be able to operate under the following conditions:

Ambient air temperature: 0°C to 40°C (32°F-104°F)

Operating humidity : 10% to 90% relative humidity (non-condensing)


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.