![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Calculating Ripro UPS requrements
L. Weissman
11/05/98
The following are power requirements of our equipment. These should be taken into consideration when calculating the size of the UPS that is REQUIRED for any server installation.
| F50 | 1.2 kva |
| EV1000 | 2.3 kva |
| EV200 | 0.4 kva |
| Q47 | 0.3 kva |
| Q2.15 | 0.2 kva |
| DLT4500 | 0.1 kva |
| Switch 3300 | 0.1 kva |
The "old" Oneac UPS supported up to 1.85 kva, the new Exide UPS up to 6 kva.