Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Archiver JTP disconnected when trying to archive or purge a job after upgrading to 3.0.


Product

  3.0.3.0

Platform

 

Operating system

 


Error

 

Z 26Jan06 10:35:08.500-GMT [1172.2180] YCS1705-823 ARAXI PDeviceAndServiceD.XCON_Callback DASS_OpCon.cpp(382): Message from Extreme: JTP used by an active process has disconnected from the coordinator: Purge:Disk Purge.

Error in Application Log

Assertion failure - Expression: iActualHeader == iHeaderSize

Program: D:\P2.0.4\AdobeExtreme\bin\PPurgeJTP.exe

Process Id: 7476 Thread Id: 7496

File: FLSY_FileInfo.cpp

Line: 185

, File: FLSY_FileInfo.cpp, Line: 185.


Symptoms

 

When trying to archive or purge an old job after upgrading to 3.0, Archiver JTP disconnected.

There is no obvious diag log message. However, there was error captured in Application log.


Cause

  Needed to add code to read "offset" value from a sparse block, since seeking over sparse blocks doesn't work.

Solution

 

There is a one off Archiver and Purge JTPs to temporary fix this for 3.0.3.0. Rename the original JTPs in \Prinergy\AdobeExtreme\Bin folder and copy the new one into it.

See also for the one -off JTPs.

The fix will be on 3.0.3.1 and 3.1.0.

Permanent fix:


See also

 

Archiver One-off JTPs


Keywords

 

archiver, archiver - purge


Technical contact(s)
 

Amy Chan

Submitted by
 

Amy Chan

Date submitted
 

17 Feb 2006


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.