Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


How do I check path migration status?


Product

  Prinergy 3.0

Platform

 

Operating system

 


Error

 


Symptoms

 


Cause

 

Solution

 

To check that path migration is complete:

1) Open regedit.

2) Locate the registry key: HKEY_LOCAL_MACHINE\Software\Creo\Araxi\Settings\Default\System.

3) Check the value "PathMigrationFinished". If the value does not exist, start Prinergy to begin the path migration process.

PathMigrationFinished values:

PathMigrationFinished = 0 path migration is in progress

PathMigrationFinished = 1 path migration step 1 is complete, waiting to start step 2 of the path migration

PathMigrationFinished = 2 path migration is complete

4) If PathMigrationFinished value is 1, stop and restart Prinergy to complete the final step in path migration.

5) If PathMigrationFinished value is 2, path migration is complete.

To check how many jobs still require path migration, locate the table in the database called DBCS_PathMigrate_Temp. The number of rows in the table indicates how many jobs still require path migration.

Use these commands:

D:\> sqlplus.exe prinergy/araxi@araxidbserver

SQL> select count(*) from dbcs_pathmigrate_temp;

SQL> exit;

Permanent fix:


See also

 


Keywords

 

install


Technical contact(s)
 

Amy Chan

Submitted by
 

Amy Chan

Date submitted
 

17 Aug 2006


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.