FCO 21629
Dolev 4Press - New Loading,
Unloading and Cutter MotorsDecember 12,
1995
The loading, unloading (take) and cutter motors are being replaced
with higher ratio motors.
| Prepared By: |
A. Posner |
FCO Kit No.: |
510F21629 |
| Comp. Level: |
N/A |
Machine S/N: |
N/A |
| Catalog No. |
509F38466 |
S/W Affected: |
N/A |
| Type of Change: |
Conditional |
|
|
| Product Mgr: |
K. Paperny |
Approval Date: |
21/12/95 |
| Product Support: |
S. Amit |
Approval Date: |
17/12/95 |
| Service Mgr: |
S. Cohen |
Approval Date: |
24/12/95 |
This FCO can
be implemented only if DC Motor Drives II (503C40798S)
is installed on the machine. If it has not yet been installed, FCO 21145 must be
implemented first.
- Reason for Change
1.1 The new motors can support 7 mil film.
1.2 Improved loading/unloading.
- Description of Change
The load, unload and cutter motors are replaced with new motors.
- Change Procedure
Replacing the Loading Motor:
- Disconnect the motor cable.
- Release the two screws that attached the motor bracket to the right
flange.
- Remove the motor. Make sure that the inner part of the coupling motor
will not fall down.
- Disconnect the part of the coupling from the roller edge.
- Install the new motor, new base and the new coupling.
Replacing the Unloading Motor
- Disconnect the motor cable.
- Release the two screws that attached the motor bracket to the right
flange.
- Remove the motor. Make sure that the inner part of the coupling motor
will not fall down.
- Disconnect the part of the oupling from the roller edge.
- Install the new motor, new base and the new coupling.
Replacing the Cutter Motor
- Disconnect the motor cable
- Release the two screws that attach the motor bracket to the right
flange.
- Remove the motor.
- Remove the sprocket from the motor.
- Install the sprocket on the old base and motor assembly.
- Install the new motor and the base.
- Adjust the cutter chain if needed.
Setting the Motors Parameters
- Verify that the motor parameters are set correctly
- Set the parameters if needed
- Test Procedure
4.1 Load film and run first load. Verify standby status
4.2 Advance the film and run cut & collect. Verify good operation.
4.3 Expose some jobs and make sure that the film movement is acceptable and without any
errors.
- Parts List
1x 504S42140 Cut Motor Gear 1:60.5
9x 380A06101 SOC HD CAP STST 10-32.3/4"
9x 382D14000 Spring STST #10
2x 504S42141 Motor Gear 1:38.3
1x 291A7G064 Base Loading Motor H9
1x 291A7G065 Base Unloading Motor H9
2x 354C13025 OLDHM CPL D=3/4
4x 380A03041 SOC HD CAP STST 6-32.3/8"
- Attached Documentation
Motors Parameters Table
- Material Disposition
The old parts may be disposed.
- Logistics
Material for this FCO will be suplied 3 months after an order is placed.
| Subsidiary |
No. of kits which may be ordered |
| STA |
up to 10 kits |
| STE |
up to 15 kits |
| STMA |
up to 2 kits |
| STN |
up to 2 kits |
Go back
|