![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Prepared By: A. Posner
January 2, 1994
FCO #18766 Dolev 800 O/M Assy (800/800P)
Adding a new cover to the Lead Screw Edge to prevent the Dyn. Optic Cable from
catching
Explanation
of Conditional Change
Reason for Change
Description of Change
Change Procedure
Test Procedure
Parts List
Attached Documentation
Material Disposition
Logistics
This FCO should be performed in order to prevent the Dynamic optic cable from being caught by the lead screw or Home position detector.
Sometimes the Dynamic optics cable is caught by the Lead screw or the Home position detector. The cover will prevent it.
A new cover is added to the Lead screw edge.
Move the carriage from side to side and make sure that the Dynamic optic cable does not get caught in the cover.
The kit for performing this FCO consists of:
| 280B38913 | LEAD SCREW COVER | x 1 |
| 382D08000 | SPRING L/W STST # 6 | x 2 |
| 380J03031 | PHIL PAN HD STST 6-32*5/16" | x 2 |
Figure: Lead screw - left view (zoom image)
None.
Material for performing this FCO will be shipped according to orders from the subsidiaries.