Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Prepared By: A. Posner
04 Aug 94

FCO #19374 Dolev 800P Load & Unload Assy -Solving Scratches on Film

Parts Affected: 507E35520

Replacing the loading film guide and the film guide tube with new guides to eliminate scratches on film in the loading path that are caused by the loading film guide or the film guide tube   

Perform this FCO in cases of scratches on film that are caused by the loading film guide or the film guide tube assembly in the loading system.

FCO Kit part no. : 510F19374
Effective on machines with S/N lower than 9430XXXX
Change compatibility level to:

Reason for Change
Description of Change
Change Procedure
Test Procedure
Parts List
Attached Documentation
Material Disposition
Logistics

Reason for Change

Scratches on film in the loading path that are caused by the loading film guide or by the film guide tube. It can be eliminated by using new guides.

Description of Change

Replacing the loading film guide and the film guide tube with new guides.    

Change Procedure

  1. Power off the Imagesetter using the control panel ON/OFF switch

  2. Open the left and right service door.

  3. Open the loading unit compartment doors.

  4. Remove the light-proof covers from both sides of the unit.

  5. Remove the E-ring that secures the top of the left lift-o-mat piston.

  6. Tilt the piston downwards.

  7. Open the two track locks on each side of the system.

  8. Pull the system forward 10 cm.

  9. Reinsert the piston.

  10. Remove the loading film guide (#62) and the two film guide supports 11.  Remove the film guide tube assy (#61) and the two film guide holders (#59) by releasing screws (#5) from both sides.   

  11. Install the supplied upper film guide.

  12. Install the supplied film guide.

  13. Tilt the piston downwards again.

  14. Push the loading system back and secure it.

  15. Reinsert the piston and replace the E-ring.

  16. Close all covers and doors.

Test Procedure

Load and unload about 10 sheets of film from each cassette and make sure that no scratches appear.

Parts List

281A38906 UPPER FILM GUIDE      x 1
289A38792 FILM GUIDE - TYPE 2    x 1

Attached Documentation

Dwg. 731E8A837 - Loading and Unloading System Assy II   

Material Disposition

The replaced part can be disposed.

Logistics

Material for performing this FCO will be available as of 1-SEP-94 and will be shipped according to orders.


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.