Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


1b2_0.gif (1329 bytes)Field Change Order

FCO # 20877 May 2, 1995

Improving Cassette Positioning

Prepared By: A. Posner FCO Kit No.: 510F20877
Comp. Level: N/A Machine S/N: N/A
Catalog No. N/A S/W Affected: N/A
Type of Change: Conditional
Product Mgr: S. Amit Approval Date: 05/02/95
Product Support: M. Bar Natan Approval Date: 05/02/95
Service Mgr: S. Cohen Approval Date: 05/02/95

Explanation of Conditional Change

The new handles will replace the belt and will improve the cassette positioning.

Parts Affected:    Dolev 800
FCO Kit part no.:    510F20877

1.    REASON FOR CHANGE
2.    DESCRIPTION OF CHANGE
3.    CHANGE PROCEDURE
4.    TEST PROCEDURE
5.    PARTS LIST
6.    ATTACHED DOCUMENTATION
7.    MATERIAL DISPOSITION
8.    LOGISTICS

1.    REASON FOR CHANGE

The positioning of the cassette with the belt is not accurate. The new handles will improve the cassette positioning in the loading compartment.

2.    DESCRIPTION OF CHANGE

Replace the belt with two handles.

3.    CHANGE PROCEDURE

Refer to the enclosed drawing (732E8F440)

3.1 Remove the belt and belt holder (#5) by releasing screws #21 (from both sides)
3.2 Remove the cover stopper (#2) by releasing screws #3 (from both sides).
3.3 Reinsert the screws (#21) to prevent light leak.
3.4 Install the handle holders with the handle on both sides, using the released screws.
3.5 Check and tighten all the cassette screws.
3.6 Repeat this for all three cassettes.

4.    TEST PROCEDURE

4.1 Position the cassette in the loading compartment and perform film loading.
4.2 Make sure that no "light leakage" effects the film inside the cassette.

5.    PARTS LIST

282A8F607 x3 Handle holder - right
282A8F608 x3 Handle holder - left
218B30906 x6 Handle

6.    ATTACHED DOCUMENTATION

Drawing 732E8F440

7.    MATERIAL DISPOSITION

The removed parts can be disposed.

8.    LOGISTICS

Material for performing this FCO will be supplied one month after an order is placed.


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.