![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Field
Change Order
FCO 22044 - April 17, 1996
This FCO will improve the Dolev 800 loading system
reliability.
Note: This FCO is for loading systems with the new loading cassettes. (
507H38005, 507H38006, 507G38007)
0. Header Info.
1.
Reason for Change
2.
Description of Change
3.
Change Procedure
4.
Test Procedure
5. Parts
List
6.
Attached Documentation
7.
Material Disposition
8. Logistics
| Prepared By: | A. Posner | FCO Kit No.: | 510F22044 |
| Comp. Level: | N/A | Machine S/N: | All |
| Catalog No. | S/W Affected: | N/A | |
| Type of Change: | Conditional | ||
| Product Mgr: | G. Menchik | Approval Date: | 04/17/96 |
| Product Support: | Y. Halfon | Approval Date: | 04/17/96 |
| Service Mgr: | S. Cohen | Approval Date: | 04/17/96 |
Implement this FCO (replacing 7 parts in the Dolev 800 loading system) in cases where the existing parts causing to loading jams and problems with the loading cassettes.
The light cover doors will open more and will not touch the
film.
The new driven shaft will attached to the lower one better.
The upper light cover is replaced by two parts, left and right covers.
The divider between the medium and small cassettes is replaced.
The lower light cover was changed.
The upper film guide was redesign.
Replace the existing parts with the following parts:
| Light cover Assy | 299B8F694 |
| Driven shaft | 299A8F697 |
| Upper light cover left | 293A8F706 |
| Upper light cover right | 295A8F705 |
| Divider | 271B33902A |
| Lower light cover | 280A34768A |
| Upper film guide | 281A38906A |
3.1 Disconnect the Loading system ground cable.
3.2 Remove the loading system forward.
3.3 Remove the loading system light cover doors from the bar. ( DWG #
732D8F694 parts # 2,3 ).
Note: If the old bar is the same as
the supplied one skip steps 3.4 - 3.6 and replace only the old doors with
the new doors from the new light cover
assembly.
3.4 Remove the doors bar ( DWG # 732D8F694 Part # 1 ).
3.5 Install the new light cover assembly with the doors. (DWG # 731E8F263
Sheet 3 Part # 4).
3.6 Remove the loading wheels support (DWG 731D8F263 Sheet 3 Detail K ) from
the old bar and attach it to
the new one. Adjust it until the wheels will
touch the loading roller and will revolving with them.
3.7 Insert the medium and the small cassettes into the compartment. Close the
#8-32 x5/8" screws in the
spring bracket ( DWG 732D8F694 Part # 4 ) until
it will touch the doors.
3.8 Replace the upper light covers and divider with the supplied parts. ( DWG
# 731E8F263 Sheet 1, Parts #
64,66 . Sheet 2 Part # 130 ).
3.8 Replace the lower light cover with the supplied one ( DWG. 731E8F263 Sheet
2 part # 125 ).
3.9 Replace the upper film guide ( DWG. 731E8F263 Sheet 2 Part # 61 ).
3.10 Replace the driven shaft. ( DWG. 731E8F263 Sheet 2 Part # 42 ).
Note: When taking out the driven shaft please
pay attention to the
washers on both sides of the flanges. Do not
forget to return them back when attaching the new driven
shaft.
3.11 Insert back the loading system.
3.12 Connect the ground cable .
4.1 Load the film from the two upper cassettes
4.2 Verify smooth loading without any scratches
| 1x | 299B8F694 | Light cover Assy |
| 1x | 299A8F697 | Driven shaft |
| 1x | 293A8F706 | Upper light cover left |
| 1x | 295A8F705 | Upper light cover right |
| 1x | 271B33902A | Divider |
| 1x | 280A34768A | Lower light cover |
| 1x | 281A38906A | Upper film guide |
| 30x | 380G03041 | 6-32 3/8 Screws |
| 5x | 380A05081 | 8-32 5/8 Screws |
| 5x | 380A05061 | 8-32 1/2 Screws |
| 25x | 382D11000 | Washers |
| 20x | 380A05041 | 8-32 3/8 Screws |
| 2x | 279B29375 | Washers |
| 4x | 280A29258A | Washers |
| 2x | 363K15200 | E-Ring |
| 2x | 380Y05080 | Shoulder Screws |
| 2x | 383A51095 | Spacer |
| 2x | 361C20005 | Flange Nylon |
Drawing 732D8F694
Drawing 731E8F263 Sheets 1,2,3
The removed parts can be disposed.
Material for performing this FCO will be supplied 2 months after orders are placed.