![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Dolev 800
A. Posner
January 19, 1994
This FSB deals with some changes on the Punch Units. Two changes are conditional changes and one is mandatory. It is important to perform those changes before the punch installation.
Defective
screws - need to be replaced
Improving the slugs removal
Preventing
collation between the carriage and the punch unit
The two 1/4" attachment screws ( SOC HD CAP ST1/4-20*1 1/4" ) that were supplied with each unit were defective, their dimensions were wrong, and the screws must be replaced with two new screws part # 380A09160. Perform the change only on uninstalled units. Refer to the following figure.

In order to improve the slugs removal, in cases that a problem exists, more space is needed inside the slugs compartment in the punch unit.
The procedure to do so follows:

If the distance from the edge of the film is smaller then 67 mm there might be a danger that the punch unit will collide with the carriage. In order to prevent it the cylinder was change ( # 26 ). The new design as a phase on one side and it will not collide with the carriage.
Make sure to install the new design if you have the mentioned condition.
