Dolev 800 - Loading/Unloading System - Loading System Assembly
Cassette Feeder Motors
Loading System - Type 1 (zoom image)
Loading System - Type II (zoom image)
Loading System - Motors & Sprockets (zoom image)
Loading System - Motors & Sprockets - Dolev 800P (zoom image)
The loading system contains four motors. Three of them are
for the film rollers and the last one is for the cutter movement. The three film roller
motors are identical but the plates which the motors assembly on are not symmetrical.
The motors are located as follows, 2 on the right side and one on the left side of the
loading unit. The loading system unit is located in front of the machine.
Dismantle the light shade cover (lot of screws on it). If the
motors are for the small and medium cassette than dismantle the upper cover (under the
small and medium cassettes) and if its the motor for the large cassette, open the lower
cover (behind the large cassette).
Check that the motor (the new one) is with the correct gear
and the sprocket is attached to it properly.
Insert the motor to the hole and mantel the driving chain on
it.
Light the chain by pulling the motor to the opposite direction
and tight the screws.
Open the back black cover of the motor and rewire the wires
according to the marks.