Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Dolev 800 Preventative Maintenance Procedures

Overview
Customer-performed P.M.
Service Engineer P.M. Procedure

Overview

The following paragraphs describe the preventive maintenance procedures. Most of the procedures are carried out once a year. Enclosed you will find a complete list of the procedures and how often it should be carried out. It is the duty of the service engineer to instruct the operator on how to perform the customer procedures and to make sure that they are being carried out.

Customer-performed P.M.

a. When loading new film into the cassette, the operator should remove and dust, dirt or film left in the loading  compartment.

b. When loading new film into the cassette, the operator should clean the cassette edges from any dust and dirt.

c. The operator should keep the plotter's external covers and the plotter's environment, clean and dust free.

Service Engineer P.M. Procedure

Overview
Before you start
Required Material
Checklist

Overview

The P.M. will be performed on an annual base, however it is recommended to perform some of the procedures every six months. A well performed P.M., on a regular basis, can save quite a few of the problems that you have during the service calls.

Before you start

  1. Plot the grid and ATP test in the res that the customer usually works with. Look for any patterns or effects. Keep those plots as a reference.

  2. Check if there are any mandatory FCO's to perform on the plot. Check if the comp. level list of the boards is updated, if not check or update the list.

  3. Check that the site conditions are within the specifications (temp, humidity). If necessary draw the attention of the operator to the unfit conditions.

  4. While performing the P.M., do not take apart or dismantle any part not specified for checking, cleaning or greasing.

Required Material

Alcohol
Lenses tissue
Compress air can
Optical pliers
Mobil grease: Mobilux #2
Grease gun
Flat screw driver
Phillips screw driver

Checklist

  1. Check Laser Graph & Power
  2. Clean Dynamic Optics
  3. Clean the shutter assembly
  4. Clean Internal Drum and Central Beam
  5. Clean Feeder Wheels
  6. Clean Film Spreader Wheels
  7. Cleaning Roller Dellerin Wheels
  8. Lead Screw maintenance
  9. Loading System
  10. Power Unit Voltage Adjustment
  11. Detectors Check
  12. Plot Test and Simulation

1.  Check Laser Graph & Power

Check laser graph and laser power. Compare the results with the results of the last P.M. Make sure that all fiber connections, shutter, and dynamic optic lenses are clean. If necessary, replace static optic unit.

2.  Clean Dynamic Optics

Important:

3.  Clean the shutter assembly

3.1 Pull out the shutter assembly for checking. If cleaning is necessary, select a clean work place

3.2 Place a soft cloth (lint free) to avoid damaging the parts.

3.3 Take a lens tissue with alcohol solvent and wipe the surface of the reflector and the solar cell.

3.4 Check via the diag. if the shutter solenoid functions well.

4.  Clean Internal Drum and Central Beam

4.1 Clean the drum and the beam from dust and dirt with a vacuum cleaner. Use a lint free cloth. Wipe the surfaces if necessary.

4.2 Clean the drum vacuum holes with a medical needle (use 22G1.5 or a similar needle).

4.3 Activate, via the diag, the vacuum valves a few times (both parts A & B). Check with pieces of film that the vacuum functions properly.

4.4 Check the pressure level in two positions:

  1. Without film: under pressure max. 55 cm water
  2. With film in full format: min. 65 cm water

Perform the check separately for each part. Connect the pressure gauge in the vacuum sensor place. If the pressure level is above 55 cm water, check the cleanliness of the vacuum holes. If the pressure level in full format of film is under 65 cm water, check the system for any pressure leakages.

5.  Clean Feeder Wheels

5.1 Activate the feeder wheels via the diag.

5.2 While the wheels are rotating, wipe them with a lint free cloth soaked in alcohol.

5.3 Check the force of 250 +/- 20 gr. for a pair of wheels on each film guide plate, using film and a weight gauge.

6.  Clean Film Spreader Wheels

6.1 While the spreader is in the home position, press the edge down in order to be able to clean the rollers on the other edge.

6.2 Wipe the rollers of the film spreader with a lint free cloth soaked in alcohol.

6.3 Do not release the spreader before you make sure that the alcohol has evaporated.

7.  Cleaning Roller Dellerin Wheels

7.1 Wipe the roller's Dellerin Wheels, the surfaces of the V block and the other side of the roller, with a lint free cloth soaked in alcohol.

7.2 Check that the roller chain is tied properly.

7.3 Activate the roller via the diag. and check that the roller functions properly.
7.4 Check for a smooth rotation of the two idlers in the roller chain.

8.  Leadscrew maintenance

It is recommended to perform the procedure every six months.

8.1 Fill the grease gun with Mobil Mobilux #2. Be sure the spout is filled with grease.

8.2 Bring the carriage to the center of the lead screw.

8.3 Screw the spout of the grease gun into the threaded hole in the leadscrew nut.

8.4 With the greaser, pump 10 cc of grease into the leadscrew.

8.5 Run the carriage in carriage multi mode for five minutes.

8.6 Operate the stepper motor to check that the leadscrew nut and the carriage run smoothly.

 

9. Loading System

9.1 Pull out the film cassettes and clean the compartments with vacuum cleaner.

9.2 Disassemble the light prove shelves in order to reach the lower and the upper sets of rubber wheels.

9.3 Clean the rubber wheels with lint free cloth soaked in alcohol.
caution4.gif (1531 bytes)        
9.4 Check if the cutter cuts properly. If necessary replace the cutter.

9.5 Grease the cutter shaft with Mobilux #2 and run the cutter for five minutes via the diag.

9.6 Check the tension of the cutter chain. Adjust if necessary.

9.7 Check the condition of the Motor Chains Rubber Wheels and Sprockets. If necessary replace them.

10. Power Unit Voltage Adjustment

Check if the voltage levels for the machine are correct. If necessary adjust them.

11. Detectors Check

Check the following via the diagnostic utility.
  1. Film detectors - in/out activate manually the det. and see if it responds.
  2. Cassette detectors
  3. Lever detectors - for the upper and lower compartments in the loading system.
  4. Door switches
  5. Carriage Home position
  6. Carriage End position
  7. Roller position home/end + roller counter
  8. Vacuum detectors A&B

12. Plot Test and Simulation

Run a plot of grid and ATP test. Compare the results with the plots before the P.M.. Check that no patterns or effects caused by the P.M. have occurred.



    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.