![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Applies to |
|
Release date = 07 Nov 02
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Component |
Pressure/Vacuum unit assembly air pressure valve |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Problem |
The pressure/vacuum unit assembly includes a valve that has an additional air tube hole (referred to as an air pressure valve for future use in the FCO documentation). The hole is open, which creates a vacuum leak and causes intermittent plate pickup failure. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Solution |
Install a valve stopper (shown below) in the extra hole of the pressure/vacuum unit assembly valve.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Time needed to implement |
1/2 hour |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Prerequisite FCOs |
None |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Parts needed |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Special Tools needed |
3mm Allen key | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Procedure |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Logistics |
Approved quantities:
Schedule supplies for first lots:
Lead Time: 1 month |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical contact |
Product Support Manager: Yaron Soffer
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Date submitted |
07 Nov 2002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
719-28598 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||