Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Lotem 800 Installation Guide
Introduction

Previous Page  ToC  Next Page

Lotem Installation Checklist

Use the following checklist to plan and track the Lotem 800 installation.

Installation Item

Complete

1. Site preparation

¨

2. Hardware installation

¨

3. Check for damage

¨

4. Unpack and position the platesetter

¨

5. Voltage setting

 ¨

6. Unpack & assemble cassette loading trolley

¨

7. Remove shipping guards

¨

8. Height adjustment of platesetter

¨

9. Plate conveyor assembly and connection

¨

10. Processor positioning

¨

11. Power and air compressor connection

¨

12. Operation monitor connection and cable setup

¨

13. power up

¨

14. Network setup/time setting

¨

15. Software check and start up

¨

16. Brisque unpacking & setup

¨

17. Brisque connection (TCP/IP address, fibers)

¨

18. Brisque configuration

¨

19. Punch installation

¨

20. Install and adjust the punches to the customer’s press

¨

21. customer configuration setting

¨

22. Set press formats

¨

23. Set plate size

¨

26. Lotem check

¨

27. Load/unload system

¨

28. Drum motion

¨

29. Interlocks system

¨

30. Laser status

¨

31. Observe smooth plate movement at punch entry

¨

32. Good reach at short pins

¨

33.Check plate on drum  and   make sure the plate is touching the pins on drum

¨

34. Check tail gripper on plate

¨

35. Check paper disposal stage and adjust if needed

¨

36. Exposure Test

¨

37.Check and adjust focus. If you change the focus value, make sure to change plate constant conversion thickness in registry (the value should be 300+ focus value for 0.3 mm plate).

¨

38. Calibrate and set Intensity table for res. 60, 80, 100, 120, 140. Save the table on Lotem (don’t use the save option from Brisque).

¨

39. Check and adjust if needed Res. Motor table for res. 60, 80, 100, 120, and 140.

¨

40.Check and Adj. Delay

¨

41. If installing a Lotem 8002 , check  uniformity calibration and make adjustments if necessary

¨

42. Expose a 4-plate job and check the results for quality, centering and registration

¨

43. Save the Registry and DataBase on a new floppy.
Save the files on your laptop.

¨

44. Processor check 
If you work with Kodak, save and write down the heavy fog temperature and the fog temperature. all the other plate, write down the processor speed and temperature.

¨

45. Excurve calibration

¨

46. ATP of customer formats

¨

47. Perform a customer job

¨

48. calibration

¨

49. Parallelism check of image to press punches

¨

50. Press runs

¨

51. Tone reproduction buildup

¨

52. training

¨

53. Hardware training

¨

54. Brisque functionality training

¨

55. Workflow setup

¨

56. Show the coustomer how to handle plates: plate loading in cassette, plate definition for new plate, change cassette

¨

57. Show the customer how to open and close doors, how to use the cheaters, explain the importance of laser interlocks

¨

58. Show the customer how to move tail grippers to preload position and how to perform Init XY, Init Drum, Preload and New Plate.

¨

59. Show the customer how to move the head to the end position and how to clean the lens cover.

¨

60. Show the proper shut down and start up of Lotem application

¨


Copyright (c)1998 Scitex Corporation Ltd. All rights reserved. Certain names, logos, designs, titles, words or phrases on this page may constitute trademarks, servicemarks, or tradenames of CreoScitex Corporation Ltd. or other entities which may be registered in certain jurisdictions.


Top of Page  Previous Page  ToC  Next Page


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.