![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Debris Removal System | Dehumidifier Unit (DHU) | Encoder | Engine/Drum | Fan | Rubber Insulator
Encoder Cleaning
- Operator Kit: 04-0014 BOM
- Procedure: Optical encoder cleaning procedure
- ECO: C942
Drum Speed Upgrade Procedure
- Kit: 518-00071A
- Drum Speed Upgrade Procedure
Note: 518-00071A replaces kit 02-4486A.Engine Motor Mount Stiffener
Flyoff Sensor
- Procedure, 77-0146A: Plate Flyoff Laser Upgrade
Drum Taping
- Kit: 05-0178: BOM
- Procedure: 72-3486A Drum Taping Upgrade Procedure
Drum Vacuum Pump Assembly
Use this upgrade kit and procedure to replace the whole drum vacuum pump (DVP) assembly with a new version DVP assembly (500-02732A).
- Kit: 512-00308A
- Procedure: Upgrading the Drum Vacuum Pump Assembly (719-00555A)
Drum Vacuum Pump
Use this upgrade kit and procedure to replace only the old version pump in the DVP assembly with the new version pump (15-1324).
- Kit: 512-00307A
- Procedure: Upgrading to the new drum vacuum pump (719-00554A)
Fan Relay K5
- Kit 05-0179
- Procedure: Relay K5 Upgrade
- ECO: D880