Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Version 3 Picker Upgrade

Intro | Installation Procedure | Setup/Integration | Troubleshooting | Picker Upgrade Drawings

Step 2: Mounting the picker head and routing the wrist tubing

Mount the picker head assembly to the move cylinders

Mount the cable track to the load table
Route the tubing down the front of the table post

Route the wrist tubing directly to the manifold

Back: Step 1 | Up: Overview | Ahead: Step 3


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.