There are two Film In/Out detectors in the system. They are
assembled on the left and on the right Film Guides (cubic), in the front of the
Opto-Mechanical Assembly.
Their function is to sense the loading and the unloading of
the film into the internal drum. The detectors are magnetic type.
Tighten the two screws that hold the Film In/Out detector to
its Film Guide. Make sure that the end of the lever is not above the upper surface of the
Film Guide and that the detector is operating smoothly.
Connect the Film In/Out connector and the Film Counter
connector.
Replace the Film Guide (cubic) and the one next to it and
tighten their screws.
Check/Adjust the Roller pressure tension (see procedure).
Re-install the funnel and make sure it is adjusted.
Replace the loading system and lock the knobs that lock it in
place and reconnect the wiring.