Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Dolev 800/800V/800VČ TIC -  Installation
Punch/On-Line Conveyor

Installation

Off-Site Preparation

See FCO17436 -   05/05/93 Light Area Harness
See FCO 17851 -   15/06/93 Manifold installation
See FSB 378 -   19/01/94 Changes on Punch units
See FCO 18908 -   09/03/94 Punch Basket Big R
See -   09/12/96 Dolev 800 Calibration with the Brisque
See -   26/01/97 Dolev 800 Punch Calibration with the Brisque

Considerable time can be saved by performing the following steps at the CreoScitex office, prior to travelling to the customer site.

  1. Check the punch order thoroughly. Ensure that all ordered items are present and are exactly the proper assemblies. Hand-label the punches as P1, P2.., and so on, according to the labeling of the punch holes in the customer- approved layout.

  2. Identify the punch assemblies according to their description, as in the following examples:

    PUNCH ASSY 5x9 OVAL-R:              Right design; hole shape is 5x9 mm oval.
    PUNCH ASSY 12.7 ROUND-BIG:     Big design; hole shape is a 12.7 round hole.
    PUNCH ASSY 1/4" x 3/8"                   Left design; hole shape is a 1/4" x 3/8" oval,
    OVAL-90* ROT-L                                 rotated 90 degrees.

    The suffix R, L or B in the punch hole labeling (P2L, P5B, etc.) refers to the
    design sub-type, i.e., Right, Left or Big.
  1. If the customer ordered a non-standard punch assembly, spare parts should also be present in the kit: one (1) spare punch for every three (3) or less punch assemblies of the same hole shape.

  2. Proceed with the installation only if you have all required punch assemblies according to the layout. Do not change anything in the layout without first consulting the CreoScitex specialist. Changes in the layout may cause problems during installation, resulting in excessive work.

  3. Except for Steps 1 and 2 of Section 2.5, Punch Assemblies Installation, all subsequent activities must be performed at the customer site.

    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.