Dolev 800 - Loading/Unloading System -
Loading System Assembly
Rubber Roller (Driver) Chain (small)
Loading System Type I (zoom image)
Loading System - Type II (zoom image)
Replacing the Driver Roller Assembly Chain
Description
Replacement
Check
The chain drives the two rubber rollers. The rubber rollers
load the film from the loading cassette into the pressure rollers.
Tools
and Accessories
Remove
the Old Assembly
Assembling
the New Chain
Tools and Accessories
jig 280A34180
jig 280A34180 - a
jig 280A34180 - b
Flat screwdriver
Phillips screwdriver
Allen keys
Rubber Roller jig 280A34180
Remove the Old Assembly
Note : The orientation of the illustration is from
the back side of the assembly.
Remove the loading/unloading system.
Remove the connector cables and the cover (#93).
Remove the lower small light cover (#124).
Disassemble the cassette motor (#82).
Remove three 8-32 x 5/8 screws and washers (#64,23,6,5).
Pull the motor forward to free the chain from the motor
sprocket. The motor wiring is still attached to the motor: Be careful not to displace the
wires.
Disassemble the upper lever (#6,5,23,39).
Free the washers, E-rings and spring. Place the loading system
on its side.
Insert the rubber roller service tool (280A34180) into the
driving shaft (#41). Gather all of the Dellerin washers.
Remove the rubber roller (#52).
Remove the chain (#29).
Assembling the New Chain
Insert the new chain (#29).
Put back the rubber roller (#52).
Insert the rubber roller service tool (280A34180) into the
driving shaft (#41). Put each of the Dellerin washers on the roller, in the correct order.
Put back the washers, E-rings and spring. Place the loading
system right side up.
Re-assemble the upper lever (#6,5,23,39).
Insert the motor with the axis slightly forward. Place the
chain on the motor sprocket. Push the motor into position with the chain tension set.
Re-assemble the cassette motor (#82).
Tighten three 8-32 x 5/8 screws and washers (#64,23,6,5).
Check that the chain path is parallel to the side plate (#1).
This indicates alignment between the motor sprocket and the drive rollers.
Put back the lower small light cover (#124).
Re-connect the connector cover (#93) and cables.
Replace the loading/unloading system.
Enter the diagnostics program. Select UTILITIES, MECHANICS.
Select 4. Cassette from the Mechanics Menu:
Mechanics Menu
1. Carriage
2. Roller
3. Spinner
4. Cassette
5. Feeder
6. Cutter
7. Vacuum/Valve
8. Others
9. Detectors
Run the small cassette forward and backward:
Forward Cass.
Reverse Cass.
Stop Cass.
When the unit completes the check, assemble the loading and
unloading system onto the Imagesetter.
Perform five (5) minimum length film feeds from the small
cassette. Measure the film. It must match the film length you entered.