Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Field Change Orders (FCOs)

Next failure | Next visit | See also | ECO/100 Label Documents | FCOs By Number

Next failure

FCO Description Release Date Priority Service Actions
D646 Shutter Replacement August 2000 Next shutter failure Replace the shutters according to the following procedure:Thermal 1/1.7 Shutter Sensor Replacement Procedure 
E445 Improved debris nozzle(50-2117C) is less likely to clog the vacuum sensor port with ablative debris. Click on the photo below for old and new versions of nozzle.
Jan 2002 Next failure Order kit 05-0246 - includes nozzle,air jet plate, tube and fitting
Install procedure
E453 DHU Kit updated: valve added, kit part numbers updated. 22 Oct 2001 Next Failure Refer to the Dehumidifier Unit (DHU) Installation Procedure.
Be sure to order the correct kit. Note that the part numbers have changed:
E246 Replace desiccant box with dehumidifier unit Aug 2001 Next Failure Discontinue desiccant systems. Replace with dehumidifier systems that provide clean dry air to slightly pressurize (0.05 tp 0.5" WG) the optical cavity. Refer to the Dehumidifier Unit (DHU) Installation Procedure.

Next visit

CA13653 Remove the cable connector cover (PN 57-5934A) Nov 2007 Next Visit Remove the cable cover from the head.
See the procedure in FCO CA13653.
D404 New airjet plate without window April 2000 Next Visit Upgrade ALL 1.7X heads on V-machines with new airjet plate (kit PN 30-1163A-C)
Air Jet Plate Assembly Installation Procedure 

See also

FCO CA12621: New yellow Propylene Glycol coolant(090-00326A) replaces pink Ethylene Glycol coolant(82-1032A). For details, see the Trendsetter FCOs page.

ECO/100 Label Documents

For all obsolete FCOs, see Thermal 1/1.7 FCOs Archive.


    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.