Planned Maintenance Procedure

Strictly confidential. Do not leave at a customer site.

Planned maintenance (PM) is to be performed only by Creo service personnel or by trained and certified operators.

To print out the PM instructions below, click on the print icon at the top of the page.

Before going to the site:

Notes:

PM and Jigs parts lists:

Important: While performing the PM, do not take apart or dismantle any part not specified for checking, cleaning or greasing.

A:  Safety and Exterior

Objectives:  Check safety first!  Determine that all Lotem 800 Q / II Family components are safe to operate and to work on. Walk around the entire device to examine the exterior and surroundings for damage and any issues that may require further investigation or repair.
Time needed:  20 minutes  (Device can be returned to customer any time.)

Safety and Exterior Evaluation What to Do What to Look For Procedure

Parts

Site conditions Check that the site conditions are within the specifications, and inform operator of any unfit conditions.
  • Temperature
  • Humidity
 
Doors, panels, and interlocks
  1. Visually inspect the overall condition of all surfaces.
  2. Open each door and panel.
  3. From the PC Controller, check safety interlocks.
Safety interlocks should operate correctly.  
Vacuum hoses Check exterior hose. Ensure that it is not being crushed or broken.  
Debris cabinet hose Check exterior hose. Ensure that it is not being crushed or broken.  

B:  System Operation

Objectives:  Determine that the Lotem 800 II is operating correctly. Watch and listen. Note irregularities for further investigation.
Time needed:  20 minutes  (Device can be returned to customer any time.)

System Operation What to Do What to Look For Procedure

Parts

Operator feedback Speak with the operators and prepress manager.    
Operator training Make sure the operators understand how to operate the device safely.    
Backup settings #1 Backup the following info:
  1. Database folder
  2. Registry
  3. Flash.bin file
  4. Ram.bin file
   
**Expose a large gray scale in three of the client's favorite formats.**
Loading Watch and listen. Smooth, symmetrical and quiet movement; loading sequence progresses without problems.  
Paper disposal Watch and listen. Paper is disposed of smoothly.  
Drum vacuum Watch. Plate is held firmly to drum.  
Head/tail grippers Listen. Listen for any irregular noises.  
Carriage operation Listen. Listen for any irregular noises.  
Edge detection Listen and watch monitor. Finds edge quickly, on first try.  
Expose operation Listen and watch monitor. Listen for retraces and any irregular noises.  
Plate unload from drum Watch and listen.    
Unload system Watch and listen. Smooth quiet operation, plate unloads without problems.  

C:  Imaging

Note:  To properly assess image quality, the processor should have been serviced and filled with fresh chemistry within the last 24 to 48 hours.

  What to Do What to Look For Procedure

Parts

Quantum
Laser Check laser calibration. Compare the results with the results of the last PM.  

D: Assemblies and components

Objectives:  Check everything, then go back and repair or adjust as required.
Time needed:  4 hours

Lotem 800 Q / II Family What to Do What to Look For Procedure

Parts

ECOs/FCOs Check that all mandatory FCOs are implemented on the Lotem 800 Q / II Family.  

Lotem 800 II FCOs

Board revision levels
  1. Record the revision levels.
  2. Run diagnostics.
  3. Update, if required.
  • NUC (for Quantum only)
  • MB local 3
  • Local 3
  • CTP power
  • Interlock 2 (omron)
  • E box MB
  • TMCE
  • CA
 
Detectors Clean detectors with rice paper and alcohol.
  • Load gripper enable
  • Unload gripper enable
  • Balance
  • Centering pins
  • Punch short pins
  • Unload tray
  • Conveyor detector
 
Air flow regulators Adjust for smooth operation every 3 months.    
Actuator pistons Adjust for smooth operation every 3 months.    
E-box fans Clean every 6 months.    
Overall system Check for rust and paint damage every 6 months.    
Loading/unloading system
Loading/unloading rollers Clean with a clean cloth and alcohol super rubber rejuvenator every 3 months.    
XY rails Clean and lubricate every 6 months.    
X and Y belts Check tension and adjust, if required.    
XY loading bar
  1. Check parallelism.
  2. Clean.
  3. Adjust, if required.
   
Suction cups Check for wear every 3 months and replace, if required.    
Head/tail grippers Check and tighten all screws every 6 months.    
External conveyor ball bearings Lubricate ball bearings every 6 months.    
Paper disposal rollers Clean with a clean cloth and alcohol super rubber rejuvenator.    
Loading pump air filter Check loading pump air filter every 6 months.  
Internal fans Check every 6 months.  
Drum system
Drum vacuum pump air filter Replace every 6 months.  
Drum vacuum holes

Clean every 3 months.

 

 
Vacuum hoses Visually check every 3 months. Wear or damage  
Edge detection strip Clean.    
Intake air filter Clean every 6 months.  
Spring spoilers Replace every 6 months.    
Swivel rotation unit Lubricate every 6 months.  
Carriage system
Leadscrew Clean and lubricate every 6 months.    
Oil pads for V block Clean and lubricate every 3 months.    
V block and carriage Clean every 3 months.    
Punch system
Punch slugs Clean punch slugs in both machine and Slugs box every 3 months.    
Punch HP Check performance, and tighten screws every 3 months.    
Lotem 800 w/MCU
Lotem 800 Quantum
Water pump Oil the pump's motor on an annual basis.   Cooling system preventive maintenance
UDRC particulate filter Replace, as required, every 6 months, or every 10,000 M2 of plate.   See Chapter 4, page 32
Cooling system Check every 6 months.
  • Cooling water pump
  • Pressure test
  • Strainer
  • Draining cooling liquid
Cooling system preventive maintenance

E:  Workstation

Objectives:  Test the system thoroughly before leaving the site!  Update any/all firmware. Note updates under Service Commands on the customer's PM Checklist.
Time needed:  2 hours

Refer to the Control-Settings page for details of controlled releases.

Workstation What to Do What to Look For Procedure

Parts

Quantum
SCSI cable Visually inspect the overall condition of the SCSI cable and connections. Replace as required.    
TSP cable Visually inspect the overall condition of the TSP cable and connections. Replace as required.    
Head firmware Update to the current Controlled Release version.   Procedure
TMCE firmware Update to the current Controlled Release version.   Procedure
Xilinx Update to the current Controlled Release version.   Procedure
Post Update to the current Controlled Release version.   Procedure
Boot Update to the current Controlled Release version.   Procedure
  **Test operation.**

 

F:  Service Comments

  1. Record PM call information.
  2. Perform fine machine calibration after PM:
    1. Perform a minimum of two loading sequences with different plate sizes and thicknesses. Adjust the parameters, if required.
    2. Perform the following Lotem 800 calibrations:
      • Focus
      • Wpower
      • Slop
      • Curve
    3. Expose the final ATP, and check the machine calibration quality.
    4. Expose a job, and obtain approval for machine quality.
    5. Back up the registry and the database to a floppy disk.
  3. Complete the "Service Comments" section of the Lotem 800 Q / II Family Planned Maintenance Checklist. For the customer's information, make a note of:

G:  Customer Acceptance

To complete the PM, the Checklist must be signed off by the customer and returned to Creo.