![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
Boards & Power System | Cassettes
| Drum System & Carriage | Loading/Unloading
Systems |
Miscellaneous | Punch System |
Software | Unload Tray System |
FCOs unique to Lotem Quantum Spectrum | FCOs
for the MCU |
| Models: | |||
| L8II: Lotem 800 II | L8Q: Lotem 800 Quantum | LQS: Lotem Quantum Spectrum | MCU: MCU |
| ALL: Applicable for all Lotem 800 II thermal head platesetters. | |||
Important: Whenever you implement
an FCO, make sure you download and install the latest version of the FCO Updater
Utility: Download the latest version (12 May 08).
For more information see the FCO Updater utility page.
|
FCO:
512-03285A
|
Date: 01 Feb 04 |
Priority:
Next failure
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
Add a capacitor to the Local3 board's reset circuit. |
||||
|
FCO:
512-03310A
|
Date: 04 Dec 03 |
Priority:
Next visit
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
Add a power failure protector board. |
||||
|
FCO:
512-02139A
|
Date: 18 Nov 03 |
Priority:
Next visit
|
Time: 0.25 hr | Model: ALL |
|
Component/Activity:
Connect
a closed circuit connector to each of the Local3 boards. |
||||
|
FCO:
512-01500
|
Date: 15 Jun 03 |
Priority:
Next visit
|
Time: 0.5 hr | Model: L8II, L8Q |
|
Component/Activity:
Add a power surge protector. |
||||
|
FCO:
512-00470
|
Date: 25 Feb 03 |
Priority:
Next visit
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Replace the the carriage amplifier board. |
||||
|
FCO:
512-01395
|
Date: 27 Feb 02 |
Priority:
Next visit
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Connect the debris removal air pressure sensor tube to the MCE board. |
||||
|
FCO:
28284
|
Date: 07 Jan 01 |
Priority:
Next
failure
|
Time: 0.5 hr | Model: L8Q |
|
Component/Activity:
Replace the old NUC board with the new NUC Com level P. |
||||
|
FCO:
512-00234A (pdf)
|
Date: 12 Apr 05 |
Priority:
Next failure
|
Time: ¾ hr | Model: Lotem 850 DLC |
|
Component/Activity:
Dual-loading cassette (DLC) system for the Lotem 850. |
||||
|
FCO:
512-00183A
|
Date: 10 Feb 05 |
Priority:
Next visit
|
Time: ¾ hr | Model: ALL |
|
Component/Activity:
Multi-cassette unit (MCU) system. |
||||
|
FCO:
512-00182A
|
Date: 10 Feb 05 |
Priority:
Next visit
|
Time: ¾ hr | Model: ALL |
|
Component/Activity:
Single-loading cassette (SLC) system. |
||||
|
FCO:
512-00181A
|
Date: 10 Feb 05 |
Priority:
Next visit
|
Time: ¾ hr | Model: ALL |
|
Component/Activity:
Dual-loading cassette (DLC) system. |
||||
|
FCO:
512-00092A
|
Date: 22 Apr 04 |
Priority:
Next failure
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
Replace the air nozzles with silicon cups. |
||||
|
FCO:
512-00387A (pdf)
|
Date: 26 Oct 06 |
Priority:
Next failure
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Replace the carriage amplifier TMCE tray. |
||||
|
FCO:
512-00314A (pdf)
|
Date: 18 Jan 06 |
Priority:
Next visit
|
Time: 4.5 hrs | Model: ALL |
|
Component/Activity:
Replace the tail gripper springs. |
||||
|
FCO:
512-00120A/512-00121A (pdf)
|
Date: 12 Aug 04 |
Priority:
Next failure
|
Time: 2 hrs | Model: ALL |
|
Component/Activity:
Install a new design of middle lever with extended arms. |
||||
|
FCO:
512-00133A (pdf)
|
Date: 03 Aug 04 |
Priority:
Next visit
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Replace the existing shoulder screws with self locking screws. |
||||
|
FCO:
512-00106
|
Date: 05 Jan 03 |
Priority:
Next failure
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Replace the drum load rollers and drum roller springs with the new drum
roller spring unit. |
||||
|
FCO:
28844
|
Date: 05 Jan 03 |
Priority:
Next failure
|
Time: 1 hr | Model: L8Q, LQS |
|
Component/Activity:
Replace the standard unload roller assembly with an unload roller assembly
that includes a single roller. |
||||
|
FCO:
29167
|
Date: 04 Sep 02 |
Priority:
Next failure
|
Time: 0.5 hr | Model: L8Q, LQS |
|
Component/Activity:
Replace the drum load rollers/drum roller springs with a new drum roller
spring unit. |
||||
|
FCO:512-00461A (pdf)
|
Date: 07 Oct 07 |
Priority:
Next failure
|
Time: 30 mins. | Model: L8Q |
|
Component/Activity:
Bar flag |
||||
|
FCO:512-00462A
(pdf)
|
Date: 07 Oct 07 |
Priority:
Next failure
|
Time: 45 mins. | Model: L8Q |
|
Component/Activity:
Tweezer assembly |
||||
|
FCO:
512-00351A (pdf)
|
Date: 04 Oct 06 |
Priority:
Next failure
|
Time: 3.5 hrs | Model: L8Q, LQS |
|
Component/Activity:
Upgrading to a one piece load roller. |
||||
|
FCO:
512-00250A (pdf)
|
Date: 22 Jan 06 |
Priority:
Next failure
|
Time: 3 hrs | Model: ALL |
|
Component/Activity:
Improving the centering system. |
||||
|
FCO:
512-00290A (pdf)
|
Date: 19 Sep 05 |
Priority:
Next failure
|
Time: 0.5 hrs | Model: ALL |
|
Component/Activity:
Improving the unload rollers protecting the plate. |
||||
|
FCO:
512-00197A (pdf)
|
Date: 13 Apr 05 |
Priority:
Next failure
|
Time: 1.5 hrs | Model: ALL |
|
Component/Activity:
Plate support deep punch assembly. |
||||
|
FCO:
512-00222A (pdf)
|
Date: 15 Feb 05 |
Priority:
Next failure
|
Time: 1.5 hrs | Model: L8Q, LQS |
|
Component/Activity:
XY vacuum pump. |
||||
|
FCO:
512-00213A (pdf)
|
Date: 16 Nov 04 |
Priority:
Next visit
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Suction cup assembly. |
||||
|
FCO:
512-00207A (pdf)
|
Date: 21 Jan 04 |
Priority:
Next visit
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
Replace the existing paper/plate detector. |
||||
|
FCO:
512-01636
|
Date: 20 Jul 03 |
Priority:
Next failure
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Change the bar flag construction by adding a grounding cable to the
loading system bar. |
||||
|
FCO:
512-01485
|
Date: 10 Jul 03 |
Priority:
Next failure
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
DLC roller bearings. |
||||
|
FCO:
512-00105
|
Date: 18 Nov 02 |
Priority:
Next visit
|
Time: 0.5 hr | Model: L8Q, LQS |
|
Component/Activity:
Ground the DLC bypass board. |
||||
|
FCO:
512-00269A (pdf)
|
Date: 24 Jun 05 |
Priority:
Next visit
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
Change the crossover connection leading from the platesetter to the
Brisque with a network connection. |
||||
|
FCO:
512-00254/A
|
Date: 13 Nov 02 |
Priority:
Next failure
|
Time: 1.5 hrs | Model: L8Q, LQS |
|
Component/Activity:
Replace the front and rear door gas spring pistons. |
||||
|
FCO:
512-01334
|
Date: 26 Mar 03 |
Priority:
Next failure
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Insert a 0.5 mm spacer to adjust the position of the GTO registration
pins on the punch beam. |
||||
|
FCO:
512-01322
|
Date: 26 Mar 03 |
Priority:
Next failure
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
Attach a Teflon strip to the punches' covers. |
||||
|
FCO:
512-00416A (pdf)
|
Date: 21 Dec 06 |
Priority:
Next failure
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Creo Feature Licensing Server |
||||
|
FCO:
512-00327A (pdf)
|
Date: 09 Nov 06 |
Priority:
Next failure
|
Time: 2 hrs | Model: L8II |
|
Component/Activity:
Upgrade Kodak Lotem Controller software to version 3.82.12. This latest version features UDRC detector support. |
||||
|
Date: 09 Nov 06 |
Priority:
Next failure
|
Time: Two days | Model: L8II | |
|
Component/Activity:
Upgrade to Windows 2000 Professional. |
||||
|
FCO:
512-00337A (pdf)
|
Date: 06 Feb 06 |
Priority:
Next failure
|
Time: 1 hr | Model: ALL |
|
Component/Activity:
Install Microsoft Windows 2000, version 1.04 image. |
||||
|
Note:
This FCO is
currently only available from the Downloads
page (Software Updates)
|
||||
|
FCO:
512-00302A (pdf)
|
Date: 25 July 05 |
Priority:
Next visit
|
Time: 0.5 hr | Model: ALL |
|
Component/Activity:
Improving the reliability of the unloading process, from the drum to
the tray stage. |
||||
|
FCO:
512-00229A
|
Date: 12 Dec 04 |
Priority:
Next failure
|
Time: 1 hr | Model: L8II |
|
Component/Activity:
Lotem 800 II Update 2 for Lotem Controller software version 3.75.09
running Windows 2000. |
||||
|
FCO:
512-00143A
|
Date: 24 Oct 04 |
Priority:
Next failure
|
Time: 1 hr | Model: L8II |
|
Component/Activity:
Lotem 800 II Update 1 for Lotem Controller software version 3.75.09
running Windows 2000. |
||||
|
FCO:
512-00141A (pdf)
|
Date: 05 Aug 04 |
Priority:
Next failure
|
Time: N/A | Model: L8Q, LQS |
|
Component/Activity:
Install the support tools from the Accessory CD. |
||||
|
FCO:
512-01523
|
Date: 10 Oct 03 |
Priority:
Next visit
|
Time: 2 hr | Model: L8Q, LQS |
|
Component/Activity:
Load firmware version 1.01h |
||||
|
FCO:
512-00684
|
Date: 06 Jan 03 |
Priority:
Next visit
|
Time: 1 hr | Model: L8Q, LQS |
|
Component/Activity:
Load firmware version 1.20.04 and Xilinx version 1.37. |
||||
|
FCO:
512-00091A
|
Date: 02 Jun 04 |
Priority:
Next failure
|
Time: 1 hr | Model: L8II, L8Q |
|
Component/Activity:
Replace the plate on unload detector. |
||||
|
FCO:
512-00044
|
Date: 10 Dec 02 |
Priority:
Next failure
|
Time: 1 hr | Model: L8Q, LQS |
|
Component/Activity:
Replace the DC conveyor motor with encoder. |
||||
|
FCO:
512-00317
|
Date: 27 Nov 02 |
Priority:
Next visit
|
Time: 1 hr | Model: LQS |
|
Component/Activity:
Anti scratch for the DLC Spectrum cassette. |
||||
|
FCO:
28936
|
Date: 27 Nov 02 |
Priority:
Mandatory
|
Time: 0.5 hr | Model: LQS |
|
Component/Activity:
Conveyor upgrade for the Lotem Quantum Spectrum. |
||||
|
FCO:
29241
|
Date: 16 Oct 02 |
Priority:
Conditional
|
Time: 0.5 hr | Model: LQS |
|
Component/Activity:
Anti scratch for the DLC Spectrum cassette. Replace the rollers on the
proof loading bar with soft rollers. |
||||
|
FCO:
28852
|
Date: 16 Oct 02 |
Priority:
Mandatory
|
Time: 1 hr | Model: LQS |
|
Component/Activity:
Installation of a slightly larger unloading arm EP/HP detector bracket. |
||||
|
FCO:
512-00289A (pdf)
|
Date: 20 Jul 05 |
Priority:
Next visit
|
Time: 1 hr | Model: MCU |
|
Component/Activity:
Improve the tray cylinder finger on the MCU. |
||||
|
FCO:
512-00266A (pdf)
|
Date: 25 May 05 |
Priority:
Next visit
|
Time: 0.25 hr | Model: MCU |
|
Component/Activity:
Improve the MCU cassette reliability. |
||||
|
FCO:
512-02139A
|
Date: 18 Nov 03 |
Priority:
Next visit
|
Time: 0.25 hr | Model: MCU |
|
Component/Activity:
Connect
a closed circuit connector to each of the Local3 boards. |
||||
|
FCO:
512-00661
|
Date: 16 Feb 03 |
Priority:
Next visit
|
Time: 0.5 hr | Model: MCU |
|
Component/Activity:
Add a new 220V safety outlet with OPS option. |
||||
|
FCO:
512-00508
|
Date: 16 Oct 02 |
Priority:
Conditional
|
Time: 0.5 hr | Model: MCU |
|
Component/Activity:
Replace the MCU 220V connector 6.3A fuses with 250V 5A fuses and program the Mitsubishi Speed Controller accordingly.
|
||||
|
FCO:
510F28440
|
Date: 05 Jan 03 |
Priority:
Next failure
|
Time: 1 hr | Model: MCU |
|
Component/Activity:
Replace the cassette centering arms. |
||||
|
Date: 31 Jul 02 |
Priority:
Mandatory
|
Time: 5 hrs | Model: MCU | |
|
Component/Activity:
Installation of a stronger center part assembly on the user door and
reinforcements on each tray. |
||||
|
FCO:
28762
|
Date: 02 May 02 |
Priority:
Conditional
|
Time: N/A | Model: MCU |
|
Component/Activity:
Comp level of the MCU control board has changed, so the MCU control
board assembly must be updated accordingly. |
||||
|
FCO:
510F28545
|
Date: 03 Dec 02 |
Priority:
Conditional
|
Time: N/A | Model: MCU |
|
Component/Activity:
Replace the old cassette strips with new, improved ones. |
||||
|
FCO:
28284
|
Date: 07 Jan 01 |
Priority:
Next
failure
|
Time: 0.5 hr | Model: MCU |
|
Component/Activity:
Replace the old NUC board with the new NUC Com level P. |
||||