![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
|
|
To print out the PM instructions below, click on the print icon
at the top of the page.
Planned maintenance is performed every six months.
Before going to the site:
Plot the grid and ATP test in the resolution that the customer usually works with. Look for any patterns or effects. Keep those plots as a reference.
Important: While performing the P.M., do not take apart or dismantle any part not specified for checking, cleaning or greasing.
Objectives: Check safety first! Determine
that all Dolev 800 components are safe to operate and to work on. Walk around
the entire device to examine the exterior and surroundings for damage and any
issues that may require further investigation or repair.
Time needed: 20 minutes (Device can be
returned to customer any time.)
| Safety and Exterior Evaluation | What to Do | What to Look For | Procedure
Parts |
|---|---|---|---|
| Site conditions | Check that the site conditions are within the specifications, and inform operator of any unfit conditions. |
|
|
| Door and upper cover interlocks | Open each door and the upper cover. | Ensure that the safety interlocks are operating correctly. | |
| Panels, doors and covers | Visually inspect the overall condition of all surfaces, hinges. | Smooth opening and closing, good condition | Ordering information |
| Operating panel and keys | Visually inspect and activate all four keys and buttons |
Objectives: Determine that the Dolev 800 is operating
correctly. Watch and listen. Note irregularities for further investigation.
Time needed: 20 minutes (Device can be
returned to customer any time.)
| System Operation | What to Do | What to Look For | Procedure
Parts |
|---|---|---|---|
| Operator feedback | Speak with the operators and prepress manager. |
|
|
| Operator training | Make sure the operators understand how to operate the device safely. | ||
| Firmware | Check firmware version | The latest machine firmware is installed | Release notes and firmware downloads |
| Settings | Backup settings |
|
|
| **Load film from each of the three cassettes** | |||
| Loading | Watch and listen. | Smooth, symmetrical and quiet movement in each cassette | |
| Drum Vacuum and spreader | Watch. | Film should be smoothly spread in the drum with no visible air bubbles. | |
| Cutter | Watch and listen. | Smooth quite operation and even cut edge of film. | |
| Unload system | Watch and listen. | Smooth quite operation. | |
| **Move carriage from HP to EP** | |||
| Carriage | Listen. | Listen for any irregular noises. | |
| Dynamic optic chain assembly | Watch and listen. | Dynamic optic chain opens and rewinds smoothly. | related procedure |
Note: To properly assess image quality, the processor should have been serviced and filled with fresh chemistry within the last 24 to 48 hours.
| What to Do | What to Look For | Procedure
Parts |
|
|---|---|---|---|
| **Expose a large gray scale in three of the client's favorite formats.** | |||
| Static Optic | |||
| Laser |
OR
|
|
Replace the static optic unit if value is <5000. |
Objectives: Check everything, then go back and
repair or adjust as required.
Time needed: 4-5 hours
| What to Do | What to Look For | Procedure
Parts |
|
|---|---|---|---|
| ECOs/FCOs | Check that all mandatory FCOs are implemented on the Dolev 800. | FCO list | |
| Standard controller - Board revision levels |
|
|
|
| Data box (for Dolev 800 older models) |
|
Check VLSI comp level. | VLSI comp level |
| Detectors | Run diagnostics to check detectors |
|
|
Loading system |
|||
| Loading cassettes | Vacuum and clean. | Loading shaft flanges should be in good condition, with no cracks and no magnets missing. | |
| Cassette detectors | Remove and insert the cassettes. | Confirm that the bar flag toggles between off and on. | |
| Cassette Rubber wheels |
|
Caution: Do not attempt to activate the rubber wheels while cleaning them. Your fingers could get caught in the system. | |
| Film-in detectors |
|
Make sure that the message "No Film" does not appear. | Replacement procedure |
| Loading system Feeding rollers | Clean roller Dellerin wheels |
Cleaning procedure | |
| Cutter |
|
|
Cutter assembly procedures |
| Feeder wheels | Run diagnostics. Activate and while wheels rotate, wipe them with a lint-free cloth dampened with alcohol. | Check the force of 250 +/- 20 gr. for a pair of wheels on each film guide plate, using film and a weight gauge. | |
| Film transport guides | Clean. | ||
| Unloading cassette |
|
Check for light leakage. Totally clear film indicates no light leakage. | |
Drum assembly |
|||
| Spreader |
|
|
Lock wheel pressure screw to press wheels out. Release
to free wheels. |
| Film attachment to drum |
|
There should be resistance; the film should not enter easily. |
Adjust roller tension |
| Drum cavity and central beam |
|
procedure | |
| Drum vacuum holes | Clean with medical needle (22G1.5 or similar). | ||
| Vacuum leakage |
|
|
|
| Feed detectors and counters | Run diagnostics, and replace if required. | Replacement parts | |
| Rubber wheels and sprockets (for spreader motor chain) | Check chain tension, and check condition of rubber wheels and sprockets. Replace if required. | Rubber wheels should be undamaged, and sprockets | Replacement parts |
Carriage - dynamic optic assembly |
|||
Lead screw |
Perform Leadscrew maintenance procedure. | maintenance procedure | |
|
|
Check pressure on damper and adjust if required. | procedure | |
| Carriage beam | Clean and oil carriage beam and felt. | Carriage beam maintenance | |
| Dynamic optics |
|
||
| Spinner |
|
Important: If spinner is under warranty, do not clean it! The warranty expire date is located on a label on the spinner. | |
| Shutter |
|
Shutter solenoid should function correctly. |
Cleaning the shutter |
| Penta prism / cube | Clean. | ||
| Fiber connectors |
|
||
Punch assembly |
|||
| Punch (if installed) | Remove slugs and clean container. | ||
| Air supply |
|
Input pressure should be 5 bar. | |
| Punch assys | Operate punches to verify smooth, successful operation. | ||
Power supply |
|||
| Power unit voltage | Run dignostics to check voltage levels, and adjust if required. | ||
| **Expose a large gray scale in three of the client's favorite formats. Check for patterns and uniformity, and compare to reference.** | |||
To complete the PM, the check list must be signed off by the customer and returned to Creo.