![]()
Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
To print out the PM instructions below, click on the print icon
at the top of the page.
Before going to the site:
Notes:
PM and Add On spare parts lists:
Important: While performing the PM, do not take apart or dismantle any part not specified for checking, cleaning or greasing.
Objectives: Check safety first! Determine
that all Lotem 800 components are safe to operate and to work on. Walk around
the entire device to examine the exterior and surroundings for damage and any
issues that may require further investigation or repair.
Time needed: 20 minutes (Device can be
returned to customer any time.)
| Safety and Exterior Evaluation | What to Do | What to Look For | Procedure
Parts |
|---|---|---|---|
| Site conditions | Check that the site conditions are within the specifications, and inform operator of any unfit conditions. |
|
|
| Doors, panels, and interlocks |
|
Safety interlocks should operate correctly. | |
| Vacuum hoses | Check exterior hose. | Ensure that it is not being crushed or broken. | |
| Debris cabinet hose | Check exterior hose. | Ensure that it is not being crushed or broken. |
Objectives: Determine that the Lotem 800 is operating
correctly. Watch and listen. Note irregularities for further investigation.
Time needed: 20 minutes (Device can be returned to customer any time.)
| System Operation | What to Do | What to Look For | Procedure
Parts |
|---|---|---|---|
| Operator feedback | Speak with the operators and prepress manager. | ||
| Operator training | Make sure the operators understand how to operate the device safely. | Lotem 800 Customer Training (for Brisque ver 4 + Translations) | |
| Backup settings #1 | Backup the following info:
|
||
| **Expose a large gray scale in three of the client's favorite formats.** | |||
| Loading | Watch and listen. | Smooth, symmetrical and quiet movement; loading sequence progresses without problems. | |
| Paper disposal | Watch and listen. | Paper is disposed of smoothly. | |
| Drum vacuum | Watch. | Plate is held firmly to drum. | |
| Head/tail grippers | Listen. | Listen for any irregular noises. | |
| Carriage operation | Listen. | Listen for any irregular noises. | |
| Edge detection | Listen and watch monitor. | Finds edge quickly, on first try. | Only if installed |
| Expose operation | Listen and watch monitor. | Listen for retraces and any irregular noises. | |
| Plate unload from drum | Watch and listen. | ||
| Unload system | Watch and listen. | Smooth quiet operation, plate unloads without problems. | |
Note: To properly assess image quality, the processor should have been serviced and filled with fresh chemistry within the last 24 to 48 hours.
| What to Do | What to Look For | Procedure
Parts |
|
|---|---|---|---|
| Laser | Check laser calibration. | Compare the results with the results of the last PM. |
Objectives: Check everything, then go back and repair or adjust as required.
Time needed: 4 hours
| Lotem 800 | What to Do | What to Look For | Procedure
Parts |
|---|---|---|---|
| ECOs/FCOs | Check that all mandatory FCOs are implemented on the Lotem 800. | FCOs list | |
| Board revision levels |
|
|
|
| Detectors | Clean detectors with rice paper and alcohol. |
|
|
| Actuator pistons | Adjust air pressure regulators. | ||
|
Fans
|
Clean every 6 months. | ||
|
Loading/unloading system
|
|||
| Loading/unloading tray rollers | Clean with a clean cloth and alcohol super rubber rejuvenator. | ||
| XY rails | Clean; then lubricate tunnels with white grease. | ||
| X and Y belts | Check tension. | Adjust according to the small belt tension adjustment procedure, if required. | |
| XY bar |
|
Adjust according to the align the x-y bar to be parallel to the drum procedure, if required. | |
| Suction cups | Check for wear. | Replace every 6 months (p/n 295C2M500). | |
| Head/tail grippers | Check and tighten screws. | Adjust according to the tail grippers assy adjustment, if required. | |
| External conveyor | Oil ball bearings every 6 months. | ||
| Paper disposal rollers | Clean with a clean cloth and alcohol super rubber rejuvenator. | ||
| Paper arm springs | Check for wear. | Replace every 6 months (p/n 280A4L952) | |
| Unload rollers | Clean with a clean cloth and alcohol super rubber rejuvenator. | ||
| XY loading pump (Model 0523-101Q-G181D) |
|
The width of the vacuum blades should be greater than 22 mm. | Gast XY loading vacuum pump PM procedure |
| XY loading pump Becker DT 4.8 |
|
The width of the vacuum blades should be greater than 12.5 mm. | Becker XY vacuum pump DT 4.8 procedure |
| Vacuum level | Check the XY vacuum level. | Loading (XY-system) vacuum pump check procedure | |
|
Drum system
|
|||
| Drum | Check the drum screws. | Drum screws should be secured with red paint, and the paint should not be removed. | |
| Drum vacuum |
|
Use drill 0.8 mm accessory kit (p/n 510K1R593). |
U 3.40 Drum vacuum checking procedure |
| Dry vacuum pump |
|
The width of the vacuum blades should be greater than 27 mm. | VT 4.40 vacuum pump maintenance procedure |
| Dry vacuum level | Check the drum vacuum level. | Drum vacuum checking procedure | |
| Vacuum hoses | Visually check. | Wear or damage | Replace, if required. |
| Edge detection strip | Clean. | Only if installed | |
| Swivel | Lubricate with 4-5 drops of SAE 30 motor oil. | Accessing swivel | |
|
Carriage system
|
|||
| Leadscrew | Clean and lubricate every 6 months. | ||
| Leadscrew HP fine detector | Calibrate. | ||
| Lens protector | Clean lens protector with rice paper and alcohol. | If Kodak plates are used, perform this procedure more frequently. | Lens protector access and cleaning procedure |
| Light detector | Remove and clean every 6 months. | ||
| Optic air supply (fufu) | Replace filter every 6 months. | p/n 432A10305 | See part number and location |
| Oil bracket |
|
p/n 291A2N300B | Replace oil bracket |
|
Punch system
|
|||
| Punch slugs | Remove from machine and from slugs box. | ||
| Punch HP | Check performance, and tighten screws. | ||
Objectives: Test the system thoroughly before
leaving the site!
Time needed: 2 hours
Refer to Brisque & Timna Server Preventative Maintenance for details.
| Workstation | What to Do | What to Look For | Procedure
Parts |
|---|---|---|---|
| Disk usage | Check that usage capacity is less than 95%. | ||
| Desktop | Rebuild weekly. | ||
| Desktop trash | Empty weekly. | ||
| File system | Check monthly. |
To complete the PM, the Lotem 800 Planned Maintenance Checklist must be signed off by the customer and returned to Creo.