Home | Contact Us | Submit Troubleshooting Info | Search | Help


    Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS


Installation

For configuration and upgrade procedures, see the Procedures page.

Acceptance | Installation kits | Installation procedures | See also | Site preparation

Note: After every installation, open the Output Devices Installation Report Tool and submit the Installation Report. For instructions, see Using the Output Devices Installation Report Tool. Install the Magnus VLF Installation Report Tool on the device workstation if necessary.

Acceptance

Installation kits

See also Tools and Jigs.

Installation procedures

Output devices

Automatic Pallet Loader
ContinuousLoad
Multi-Cassette Unit

Thermal head

Print Console workstation

Operator Training

To download the operator training checklists, see the Acceptance heading above.

See also

Site preparation

Automatic Pallet Loader - 719-00849

Floor Layouts

The floor layout drawings are also located at the back of the Site Preparation Guides.

ContinuousLoad - 725-00033

Floor Layouts

Multi-Cassette Unit - 725-00034

Floor Layouts

    Copyright © 2005 Creo Inc. All rights reserved. Confidential. Back to top.