Note:
PM and jigs part lists:
Before going to the site:
|
Important: |
Recommendation: To properly assess image quality, the processor chemistry should have been serviced and filled with fresh chemicals within the previous 24 to 48 hours.
Expose a Creo Plate Test Target (CPTT) in the clients favorite format. This will serve as your reference plate.
|
Imaging |
Do the following... |
Reference |
|---|---|---|
|
Imaging quality, position and size |
Inspect the exposed CPTT reference file. |
|
|
Laser |
Check maximum laser calibration (300 mW). |
|
|
Laser (Quantum) |
Check laser graph and power. |
Objectives: Check safety first! Determine that all Lotem 800 Q / II Family components are safe to operate and to work on. Walk around the entire device to examine the exterior and surroundings for damage and any issues that may require further investigation or repair.
|
Safety and Exterior Evaluation |
Do the following... |
Reference |
|---|---|---|
|
Site conditions |
Verify that the site conditions, including humidity and temperature,
are within the specifications. |
Lotem 800 II Family Site Preparation Guide |
|
Doors, |
|
|
|
Debris cabinet hose |
Verify that the exterior hose is not impeded or broken. |
|
|
Drum vacuum pump and cooling fluid leaks |
Check the floor at the side of the platesetter and verify that there are no external fluid leaks. |
|
Objectives: Determine that the Lotem 800 II is operating correctly. Note any irregularities for further investigation.
|
System Operation |
Do the following... |
Reference |
|---|---|---|
|
Backup settings |
Back up the registry, database folder, FCOs, laser uniformity and MCKey
plate counter: |
|
|
Backup settings |
In addition to the registry and the database folder, back up the following:
|
|
| Firmware (Quantum) |
Update to the current controlled release version. |
Objectives: Check all the assemblies and components,
then go back and repair or adjust as required.
Important: Before opening
any doors and panels, send
the carriage to its 500 mm position.
Load and unload at least three plates of different sizes. Verify that the loading
and unloading sequences progress successfully.
Successful loading and unloading verifies that the drum gripper rollers and
drum balance systems are working properly.
|
Assemblies and components |
Do the following... |
Reference |
||
|---|---|---|---|---|
|
Lotem 800 II and Quantum Family |
||||
|
FCOs |
|
|||
|
Board diagnostics |
Run diagnostics on the boards. |
|
||
|
Overall system |
Check for rust and paint damage every six months. |
|
||
|
Punch system |
||||
|
Punch slugs |
Every six months, clean punch slugs in both platesetter and slug box. |
|
||
|
Loading system |
||||
|
Detectors |
|
|
||
|
Loading rollers |
Clean using a clean cloth and a press blanket cleaner (such as Rubber Rejuvenator). Do not use an alcohol based cleaner. |
|
||
|
XY rails |
Clean, and then lubricate tunnels with grease. |
|
||
|
XY loading bar |
|
|
||
| Loading system vacuum pump | Check the blades and filter | |||
|
Paper disposal rollers and paper disposal tweezers |
|
|
||
|
Suction cups |
Check for wear. If worn or fractured, replace. |
|||
|
Internal fans |
Clean every six months. |
|
||
|
E-box fans |
Clean every six months. |
|
||
|
Unloading system |
||||
|
Unloading rollers |
Clean using a clean cloth and a press blanket cleaner (such as Rubber Rejuvenator). Do not use an alcohol based cleaner. |
|||
| Unloading conveyor | Visually inspect the belts for any wear or tear. | |||
|
Drum system |
||||
|
Head/tail grippers |
Check and tighten all screws every six months |
|||
|
Vacuum pump air filter |
Replace every 6 months. |
|||
|
Drum vacuum holes |
Using the cleaning jig (part number 510K1R593), with vacuum turned on, use the 0.8 mm drill to clean the drum vacuum holes. |
|||
|
Vacuum hoses |
Verify that the exterior vacuum hose is not worn, crushed or broken and replace if required. |
|
||
| Drum detectors |
Clean the following detectors with a cotton swab/rice paper and alcohol:
|
|||
|
Edge detection strip |
Clean with alcohol. |
|
||
|
Swivel |
Lubricate the swivel rotation unit with 4-5 drops of SAE 30 motor oil. | |||
|
Vacuum pressure |
Make sure the vacuum is working correctly. | |||
| Light detector (applicable only to FH platesetters) | ||||
| Light detector | Clean with a cotton swab (dipped in alcohol). | |||
|
Carriage system |
||||
|
Leadscrew |
Clean and lubricate. |
|
||
V-blocks:
|
Clean every six months. |
|||
| Debris internal hose | Verify that the internal hose is not impeded or broken. | |||
|
Lotem 800 Quantum |
||||
|
Loading pump air filter |
Replace every six months. |
|||
| Water pump | Oil the pumps motor on an annual basis. | |||
|
Internal fans |
Clean every six months. |
|
||
| UDRC particulate filter | Replace, as required, every six months, or every 10,000 m2 of plate. | |||
| Cooling system |
Check every 6 months.
|
|||
| L-box fans, ventilator openings and air paths (applicable only to FH) | Use a damp cloth to clean the fans and ventilator openings. | |||
To complete the PM, the Lotem 800 II Family Planned Maintenance Checklist must be signed by the customer and returned to Creo.