TechPlanet DVD Version 7 N.2—10 Jul 2008
05 Jun 2008: Procedure: Punch Conveyor Packing Instructions More...
This document describes how to pack the punch conveyor for shipment purposes.
Go to Other procedures on the Procedures page.
18 May 2008: Procedure: Upgrading a semiautomatic (manual) platesetter to an automatic platesetter with MCU II/SCU II More...
This document describes the hardware and software procedures that you need to perform to upgrade from a manual configuration to an MCU II/SCU II configuration.
Go to Upgrades on the Procedures page.
04 May 2008: Procedure: Installing punches More...
Punches are available in three different widths to accommodate single-, double-, and triple-punch requirements
with long punch guides. This procedure describes how to install, define, and test punches.
Go to Other procedures on the Procedures page.
16 Apr 2008: Important Notice: Centering motor pin is fragile More...
When installing the MCU/MCU II, to prevent the centering motor pin on the centering motor from breaking, carefully route the CNTR MOTOR cable through the platesetter and cable tie guide to the centering motor pin connection. For more information, see the MCU II and SCU II Installation and Upgrade Guide.
06 Apr 2008: Installation: Multi-Cassette Unit II and Single-Cassette Unit II Installation and Upgrade Guide More...
The MCU II and SCU II Installation and Upgrade Guide describes how to unpack and install a Kodak MCU II or SCU II-ready
platesetter at a customer site, or how to upgrade the Magnus 400 II and Magnus 400 II Quantum platesetters to the MCU II or SCU II configuration.
Go to Installation procedures on the Installation page.
02 Apr 2008: Procedure: Opening the MCU II front door manually More...
To open the MCU II front door manually, or when the platesetter is turned off, you need to release the Omron interlock switch.
Go to Other procedures on the Procedures page.
18 Mar 2008: Procedure: Removing and installing the alignment system motors More...
The alignment system includes two stepper motors (upper and lower) that
move the registration pins. This procedure describes how to remove and install the alignment system motors.
Go to Parts replacement on the Procedures page.
18 Mar 2008: Installation: Punch Conveyor Installation Guide More...
The Punch Conveyor Hardware and Software Installation Guide describes how to unpack and install a Kodak punch conveyor at a customer site.
Go to Installation procedures on the Installation page.
17 Mar 2008: Procedure: Removing and installing the alignment system optical sensors More...
The alignment system includes two optical sensors: the spring-pin optical sensor, and the fixed-pin optical
sensor. This procedure describes how to remove and install an alignment system optical sensor.
Go to Parts replacement on the Procedures page.
16 Mar 2008: Visual Reference Guide: The Magnus 400 II Family With Multi-Cassette Unit II More...
Use the Magnus 400 II with MCU II Visual Reference Guide (VRG) to help you maintain and operate the Magnus 400 II with MCU II configuration.
The VRG is available in 25 languages.
Go to Visual Reference Guides (VRGs) on the Reference page.
16 Mar 2008: Procedure: Removing and installing alignment system detectors More...
The alignment system includes four strategically positioned detectors: two home positions (HP) detectors, and two end position (EP)
detectors. This procedure describes how to remove and install an alignment system detector.
Go to Parts replacement on the Procedures page.
16 Mar 2008: Procedure: Removing and installing the alignment system on the punch conveyor More...
The alignment system is responsible for correctly aligning a plate before it is punched. This procedure describes
how to remove and install the alignment system.
Go to Parts replacement on the Procedures page.
10 Mar 2008: Procedure: Removing and installing the MSB_C motherboard More...
If the MSB_C motherboard is faulty in any way, you must replace it.
Go to Parts replacement on the Procedures page.
05 Mar 2008: Training: CTP Punching More...
To learn about punches, and how to order and install them according
to customer requirements, see the CTP Punching presentation.
Go to Training on the Reference page.
28 Feb 2008: Procedure: Calibrating the alignment system on the punch conveyor More...
Calibrate the alignment system on the punch conveyor to match the customer's
punch configuration.
Go to Calibration on the Procedures page.
28 Feb 2008: Magnus 400 Component Finder More...
Two versions of the Magnus 400 Component Finder are available on TechPlanet: a web-based version, which is a browser enabled, searchable database
containing all the Magnus 400 components, and a downloadable version.
Go to Tools on the Parts/tools page,
or Component finder on the Reference page.
20 Feb 2008: Procedure: Replacing the MSB_C and installing the MSB firmware manually More...
Follow the steps in Replacing the MSB_C and installing the MSB firmware manually to replace an earlier version MSB with the latest version MSB_C on the punch conveyor
and to load the MSB firmware.
Go to Other procedures on the Procedures page.
20 Feb 2008: Procedure: Replacing the support roller More...
If the red support roller is faulty in any way, you need
to replace it.
Go to the Procedures page.
20 Feb 2008: Procedure: Replacing the support roller motor More...
If the support roller motor is faulty in any way, you need
to replace it.
Go to the Procedures page.
20 Feb 2008: Procedure: Replacing the support roller belt More...
If the support roller belt is defective in any way (for example, rips or tears), you need
to replace it.
Go to the Procedures page.
20 Feb 2008: Procedure: Replacing the LED detector More...
If the LED detector is faulty in any way, you need
to replace it.
Go to the Procedures page.
20 Feb 2008: Procedure: Replacing the conveyor belt motor More...
If the conveyor belt motor is faulty in any way, you need
to replace it.
Go to the Procedures page.
TechPlanet DVD Version 7 N.1—15 Feb 2008
10 Jan 2008: Procedure: Upgrading Magnus 400 II with SCU II to Magnus 400 II with MCU II More...
Upgrade a Magnus 400 II with SCU II to a Magnus 400 II with MCU II by adding middle and upper cassette trays,
and then reinstalling the software for an MCU II configuration.
Go to the Procedures page.
05 Jan 2008: Procedure: Replacing a conveyor belt More...
If a conveyor belt is defective in any way (for example, rips or tears), you need
to replace it.
Go to the Procedures page.
02 Jan 2008: MCU II Plate Loading Sequence and Parameters Guide More...
The MCU II plate loading sequence for Magnus 400 Controller version 1.05.394 is a series of steps (movements)
performed by the platesetter that removes the plate from the cassette, transports it to the drum, and secures it to the drum. It begins
with the paper disposal task and then follows with the three loading sequence stages.
Go to the Reference page.
22 Nov 2007: Site Preparation Guide for Magnus 400 II and Magnus 400 II Quantum platesetters More...
The English version of the Magnus 400 II and Magnus 400 II Quantum Site Preparation Guide is now available. Translations will be available in February 2008.
Go to the Installation page.
TechPlanet DVD Version 6 N.3—01 Nov 2007
10 Jul 2007: Magnus 400 II Options site goes live More...
The Magnus 400 II Options site is now live, and includes product description information. We will continue to add information to the site.