Home | Contact Us | Submit Troubleshooting Info | Search | Help
Output | Software Solutions | Proofing | Color, Screening and Calibration | Scanning | Digital Photography | Consumables | POS
TechPlanet DVD Version 6 N.3—25 Jan 2007
11 Dec 2006: Troubleshooting head error 02317 The laser beam was not detected More...
For full details on how to troubleshoot this error, see Troubleshooting error 02317, The laser beam was not detected.
01 Dec 2006: Always drain the TH2 head before shipping or storage More...
If you return or store a TH2 head, you must drain the coolant first. If you do not, the coolant may freeze during transport, pressure may build during storage, or corrosion may occur during storage. All these situations cause internal leaks and cracks in the head cooling system.
This is particularly critical for thermal 2.7 heads because the laser diode is cooled directly, and therefore can be permanently damaged by any expansion in the cooling system.
The draining kit (part number 50-2465A) is included with every head, so there is no need to order any parts in advance. For the full procedure, see Draining the Coolant from a TH1 or TH2 Head.
See also: Draining and Repacking a Thermal 2 Head for Shipping.
01 Dec 2006: TH2 Final Window is not field replaceable More...
The TH2 final window cannot be replaced in the field. If the window is cracked or scratched, or if the coating is coming off, you must replace the head.
For full details, see Thermal 2 Window Cleaning Procedure.
03 Nov 2006: Humidity and oil in the air supply causes banding and error 02334: Laser Power Is Unstable More...
For details on how to troubleshoot this problem, see Humidity and oil in the air supply causes banding and error 02334.
TechPlanet DVD Version 5 N.3—01 Nov 2006
23 Oct 2006: TH2 head firmware version 1.07b released More...
Always use controlled releases to install version 1.07b head firmware. This ensures that the firmware is installed only on devices that support it.
Six new features were added, and seven problems were fixed. The highlights include:
For full details on these and other features, see the 1.07b head firmware release notes, posted on the TH2 firmware summary page.
23 Oct 2006: Updated EHR Form More...
The Exposure Head Request form (EHR) has been updated. Please delete any locally-stored copies.
See the Exposure head request (EHR) form.
25 Sep 2006: Use the artifact gallery when troubleshooting artifacts More...
If you have a new artifact, please forward plates and/or pictures, a description of the problem, a detailed solution, and any other information to Maureen Munroe.
See the Artifact gallery.
15 Sep 2006: FCO CA09695: Replace coolant connectors with Viton fittings More...
Make sure you replace the coolant connectors during your next visit. To complete this FCO you need to order the following parts:
You will also need the following procedures:
For full details, see the FCOs page.
18 Sep 2006: TH2 head firmware version 1.06 released More...
Always use controlled releases to install vesion 1.06 head firmware. This ensures that the firmware is installed only on devices that support it.
This release adds greater control of focus laser power for sensitive media.
The 1.06 head firmware is posted on the TH2 firmware summary page.
10 Jul 2006: Image corruption occurs intermittently More...
If you experience intermittent image corruption (that may be temporarily resolved by resetting the device), use the following troubleshooting item: Image corruption occurs intermittently.
29 Jun 2006: Updated Tilt procedures More...
The following documents have been updated to include the TH3 head:
09 Jun 2006: New Thermal 2.5 heads have a lower laser diode temperature More...
Thermal 2.5 heads with a serial number of T02924 or higher are being shipped with the laser diode temperature set to 20°C. Internal changes to the head support this lower temperature, which should increase the life of the laser.
If the head is unable to maintain the lower temperature, you will see one of the following errors:
[02311] The diode is over-temperature [02319] The laser diode is over-temperature For troubleshooting details, see TH2.5 head laser diode is over temperature [Errors 02311 and 02319], available on the Troubleshooting page or on Errors by number.
TechPlanet DVD Version 5 N.2—01 Jun 2006
09 May 2006: Error 02517 "A data overflow has been detected" occurs when the hotlink cable is disconnected More...
For details on how to troubleshoot error 05217, see Error 02517 "A data overflow has been detected" occurs when the hotlink cable is disconnected, available on the Troubleshooting page or on Errors by number.
09 May 2006: TH2 RMA heads are now shipping with firmware 1.05d More...
Starting May 9, RMA heads will be loaded with head firmware version 1.05d. Existing inventory will not be upgraded and will have version 1.01i.
Make sure you load device firmware that is compatible with the head firmware. To check the head firmware version type:
>> redirect enable
TH2> ver
TH2> redirect disable >>head version For details see the controlled releases page.
08 May 2006: Updated EHR form and procedure for ordering a replacement head More...
The Exposure Head Request form (EHR) has been updated and is now a controlled document. Please delete any locally-stored copies and link to the form on TechPlanet: Exposure head request (EHR) form.
Follow the correct procedure to get authorization and order a head ( Ordering a replacement head ).
See also Thermal head experts authorized for head replacements.
04 May 2006: One-pixel horizontal artifact when using command line plots from Service Shell with GMCE More...
For details on how to troubleshoot this artifact, see One-pixel horizontal artifact when using command line plots from Service Shell with GMCE, available on the Troubleshooting page under Artifacts.
24 Apr 2006: Error 02334 occurs when the shutter opens or closes More...
For details on how to troubleshoot error 02334, see Errors by number, 02334 or Error 02334 occurs when the shutter opens or closes, available on the Troubleshooting page.
22 Mar 2006: Installing a thermal 2 head on a Magnus 800 platesetter More...
Find the Installing a thermal 2 head on a Magnus 800 platesetter document on the Installation page.
20 Mar 2006: Troubleshooting low sum/edge detect failure on a Thermal 2 head More...
A low sum or edge detect failure has several causes. For details see Troubleshooting low sum/edge detect failure (available on the Troubleshooting page ).
15 Mar 2006: TH2 head firmware version 1.05d released More...
Use controlled releases to install v1.05d head firmware. This ensures that the firmware is installed only on devices that support it.
Implemented in this release:
The v1.05d firmware is posted on the TH2 firmware summary page.
23 Feb 2006: Update: Uploading Thermal 2 head firmware More...
On any device using a TH2 head, if you upload the wrong file type the upgrade will fail and the head will not function. For details on how to avoid this, see Firmware upgrade fails when loading new TH2 head firmware (available on the Troubleshooting page ).
21 Feb 2006: New troubleshooting tool: Artifact gallery More...
Use the artifact gallery to troubleshoot imaging artifacts. Open the gallery and click on the type of artifact that you’re dealing with.
Please send any feedback on the gallery, including any new artifacts, to TechPlanet feedback. Send any plate samples to your PSS.
Peruse the Artifact gallery or access it from the Thermal 2 Troubleshooting page.
21 Feb 2006: Increased media sensitivity on V- and X-speed devices More...
Increased media sensitivity on V- and X-speed devices is normal. Check the CTP media database for the correct drum speed and estimated power setting, then refer to the media tech note for the detailed setup procedure.
For an example, see section 6.3 of the Kodak Thermal Gold Technical Note.
Download the latest CTP Media Imaging Performance Database. For more details on media qualification and settings, see the Media site.
14 Feb 2006: New TH2 scorr script More...
This script tests a range of scorr values to determine the best settings for edge leakage artifacts. Use it when troubleshooting artifacts, particularly on integrating newspaper media.
Download the script: G_MCE_Scorr_v2.spt or from the Downloads page.
10 Feb 2006: Remove device-specific hardware when returning a head More...
When you return a head, make sure that you remove the debris nozzle, airjet bar, and any mounting hardware before you ship it. Any hardware from the debris removal system must be reinstalled on the new head.
If you encounter a head that is missing the airjet plate (TH2 head on TS NEWS), or any part of the debris removal system, order a replacement part immediately.
For part numbers, see Parts/tools.
08 Feb 2006: Uploading head firmware: 4- and 8-page devices with CR 5.1 and later, and Magnus VLF with CR 3.0 and later More...
Use the table on the Control/Settings page page as a guide when uploading TH2 head firmware.
TechPlanet DVD Version 5 N.1 and Mature Products 2006—31 Jan 2006
27 Jan 2006: Maintaining the contrast ratio on a thermal 2 head when stroke profile is poor More...
For details on how to maintain the contrast ratio on a thermal 2 head when stroke profile is poor, see the troubleshooting item. This will often show up as banding and is more common on heads with long laser–on hours.
Note: When solving banding problems on a TH2 head, you should first optimize the hvtrim (this drives the light valve). Next, run ContvBP.spt to either confirm that bpd beamposition is 0 or to pick the new beam position value.
This item is available on the Troubleshooting page under Artifacts.
23 Jan 2006: Thermal 2 head refresher training More...
This training is strongly recommended as prerequisite review material for personnel registering for the following classroom courses on the Learning Center:
The Thermal 2 Head Refresher Training is available as a Token or a self-extracting zip file:
These files are available on the Reference page.
08 Dec 2005: Trendsetter NEWS thermal head 1.7 to 2.x upgrade procedures for MPE and MCE More...
The new Trendsetter 800 II/NEWS MCE Thermal Head 1.7 to 2.x Upgrade Procedure was created primarily to document how to upgrade a Trendsetter 800 II-based output device with the X-speed (eXtra fast) option. However, it also applies to upgrading from a TH1.7 to a TH2 head on Trendsetter NEWS MCE-based output devices, a procedure that has not been formally documented until now.
Because this new procedure applies only to MCE-based output devices, it does not replace the existing Trendsetter NEWS TH1.7-to-TH2 Upgrade Procedure. This document has simply been renamed to Trendsetter NEWS MPE Thermal Head 1.7-to-2.x Upgrade Procedure to distinguish it from the new MCE procedure. In addition, it has been updated with the latest safety information for installing TH2 heads on MPE output devices.
Both of these documents are posted on the Procedures and Installation pages.
07 Dec 2005: Magnus VLF image artifacts caused by TH2 carriage More...
On all Magnus VLF devices with TH2 heads and carriages, faulty carriage bearings are causing vertical artifacts during imaging. This new troubleshooting item is posted on the Troubleshooting page.
05 Dec 2005: Vertical pinstripe artifact on high-sensitivity integrating media More...
Leakage light—from pixels that are turned off outside the edge of the swath—causes a pinstripe artifact on high-sensitivity integrating media like Kodak Thermal News, Kodak Thermal News Gold, and Fuji LH-NN plates. This troubleshooting item is posted on the Troubleshooting page.
27 Oct 2005: TH2 v1.05c firmware defect can cause solid stripes on plate More...
A defect has been found in Thermal 2 head firmware version 1.05c that can cause solid stripes to be plotted on plate (see Example 1 and Example 2 ).
Affected customers: Any customer using 1.05c firmware on a head with the beam correction hardware may be affected by this artifact. All new and some RMA heads are affected. Head hardware can be verified using the following firmware commands:
>> redirect pass
>> th2 eng
>> th2 io read FFE0 1
The output will be the requested memory address followed by a four-digit hexadecimal number, for example: 0000FFE0: C342
If the last character of the four-digit number (2 in this example) is equal to 2, 3, 6, 7, A, B, E, or F, the head has the beam correction hardware and action should be taken to downgrade to head firmware version 1.04d. If the last character of the four-digit number is equal to 0, 1, 4, 5, 8, 9, C, or D, the head does not have the beam correction hardware and will run firmware version 1.05c with no problems.
Required action: If you have a customer with this firmware/hardware combination, downgrade the head firmware to version 1.04d using the following procedure:
>> th2 eng
>> th2 set sys firmwareversion 1.04
This downgrade will remove all features and fixes introduced by 1.05c. For a complete list of changes in 1.05c, please review the release notes. Note that it is not necessary to downgrade host firmware or workstation software.
Moving forward: 1.05d firmware is currently being tested and will be part of a controlled release available in early December. 1.05d includes all the features of 1.05c and fixes the defect. 1.05d should be installed as soon as it becomes available, because 1.04d does not contain the beam correction feature to extend the head lifetime.
TechPlanet DVD Version 4 N.3—30 Sep 2005
19 Sep 2005: Importance of lens cleaning and debris removal More...
Recently, some TH1.7 and TH2 heads have been returned with thick debris on the final lenses. This serves as a reminder that an effectively working debris removal system saves heads. Changes in media or exposure can result in dramatic changes in debris generation. Remember also that a dirty lens can significantly reduce power output and image quality. When troubleshooting an imaging related problem or when performing a PM, please check debris systems and final lenses. When checking the debris system, ensure that the flow marginal value is set correctly, as defined on page 4 of Debris Removal Firmware Guide-Parameter Values, Descriptions and Flowchart and that the flow rate measured by the device when the debris system is operating is above the flow marginal value. Importance of lens cleaning and debris removal contains links to some examples showing the importance of lens cleaning and debris removal and links to the TH1 and TH2 leans cleaning and debris removal procedures.
18 Sep 2005: P33 versions of TH2.5 heads available More...
P33 versions of TH2.5 heads are now available for Trendsetter X-speed and Lotem 800 V-speed devices. The part numbers for the P33 heads are posted on the Overview page.
05 Sep 2005: Updated TH2 v1.05c firmware release More...
This update includes:
Only install v1.05c firmware on devices that support it, through controlled releases. The v1.05c firmware is posted on the TH2 firmware summary page.
24 Aug 2005: Dirty filters can cause TH2.7 laser diode over-temperature problems More...
Thermal 2.7 heads require extra cooling compared to other TH2 heads. The air filter in the front of the chiller may be blocked with dust, reducing the effectiveness of the chiller. Coolant flows from the external chiller through a 5-micron filter on the rear of the chiller. Failure to replace this filter on a regular basis will limit coolant flow, which may cause overheating. This new troubleshooting item is posted on the Troubleshooting page.
11 Aug 2005: Troubleshooting thermal 2 focus learn issues More...
Focus learn issues are often caused by problems with media handling and loading. This procedure provides an easy method for testing if a focus learn problem is being caused by the way the media is handled or loaded. It is posted on the Troubleshooting page.
10 Aug 2005: Thermal 2.7 laser diode is over-temperature More...
This new troubleshooting item is posted on the Troubleshooting page.
15 Jul 2005: TH2 v1.05c firmware release More...
Implemented in this release:
Only install v1.05c firmware on devices that support it, through controlled releases. The v1.05c firmware is posted on the TH2 firmware summary page.
15 Jun 2005: Hebrew translation of MSDS for pink coolant More...
The Hebrew translation of the Material Safety Data Sheet for pink coolant is posted on the Safety page.
TechPlanet DVD Version 4 N.2—31 May 2005
15 May 2005: TH2 procedures and troubleshooting items translated to Japanese More...
Several TH2 procedures and troubleshooting items have been translated to Japanese. They are available on the Translations page.
07 Apr 2005: MSDS for acetone and chiller coolant More...
Material Safety Data Sheets for acetone and chiller coolant have been posted on the TechPlanet Safety page.
11 Mar 2005: Updated Thermal 2 field scripts available More...
The Thermal 2 script bundle has been updated as follows:
tilt_mce_lq_th2.spt now backwards compatible with v1.2 firmwaretilt_mpe_th2.spt updated to remove some confusing outputThe bundle is configured to save the files to the default directories for Service Shell, so the self-extractor should be run from the root directory. For example, if Service Shell is installed in C:\ServiceShell\, run the self-extractor from C:\.
Download the script bundle from the Downloads page.
28 Feb 2004: Updated: Visual Installation Guide for TH2 on a Lotem Quantum More...
This document has been updated with a section on adding coolant during new installations. It is posted on the Installation page.
15 Feb 2005: FAQ: Thermal Head Swath Width Adjustment More...
When Creo sells a system to a customer, the device is sold with a throughput specification. Creo is obligated to maintain this specification after the sale and installation of the device. This document is an overview of the policy regarding device specification and adjusting the swath width. This document contains competitive information that should be kept confidential to Creo. It should not be displayed or left behind at customer sites. FAQ: Thermal Head Swath Width Adjustment is posted on the Reference page.
TechPlanet DVD Version 4 N.1 and Mature Products 2005—31 Jan 2005
18 Jan 2005: Updated: Adjusting tilt on a thermal head More...
This document has been updated with some important changes to the shimming procedure on the last page. The updated document is posted on the Procedures and Troubleshooting pages
05 Jan 2005: Adjusting tilt on a thermal head More...
If you need to adjust tilt on a Thermal 1.x or Thermal 2 head, make sure you use the new tilt tool and follow the correct procedure.
For details on how to use the new tool, download Adjusting Tilt on a Thermal Head and watch the Quicktime movie: Checking tilt on a thermal head (Quicktime movie): 14MB, 400x268 resolution.
To get the tool, order the following kits:
For Thermal 2 only you need the following shim kits:
You also need to download the following files:
05 Jan 2005: Updated Thermal 2 field scripts available More...
A new Thermal 2 script bundle is available. Highlights of the new script bundle include:
tilt_mpe_th2.spt, Lotem 800 Quantum: tilt_mce_lq_th2.spt, Trendsetter with MCE: tilt_mce_ts_th2.spt
setsyscomment.spt was addedLogSetup.spt was updated Note: The bundle is configured to save the files to the default directories for Service Shell, so the self extractor should be run from the root directory. For example, if Service Shell is installed in C:\ServiceShell\, run the self extractor from C:\
Download the script bundle from the Downloads page.
22 Dec 2004: Visual Installation Guide for TH2 on a Lotem Quantum now released More...
To find out how to install a TH2 head on a Lotem Quantum, download Installing a Thermal 2 Head on a Lotem 800 Quantum.
Please direct any feedback on this new document to Alvaro Ireta. Download it from the Installation page of the Thermal 2 TechPlanet site.
26 Nov 2004: P22 and P33 head compatibility More...
Trendsetter® 800 MPE devices support P22 heads only (for both non-Quantum and Quantum formats). Trendsetter 800 II MCE devices will accept P33 heads (for non-Quantum) and P22 heads (for Quantum).
CAUTION: A P33 Imaging head should not be installed on a Trendsetter 800 II MCE Quantum device or any Trendsetter 800 MPE device (Quantum or non-Quantum), as the write laser will not be enabled and the head will not function.
For full details see the P22 and P33 page, available from the following pages:
17 Nov 2004: Make sure you correctly interpret the BPDNoise.spt graph More...
Some new filters for the BPD sensor reduce the intensity of the portion of the beam used for beam positioning. As a result, when you run BPDnoise.spt the lines appear noisier because the scale of the script is not fixed.
This difference in scale changes how you analyze the graph. Just because a graph appears noisy does not mean that it is a bad result. You need to consider the percentage of variation in the higher current line, as well as the scale on the left side of the graph.
Find out how to interpret the graph: Interpreting the BPDnoise graph.
05 Nov 2004: Four more TH2 troubleshooting items translated to Chinese More...
Four troubleshooting items have been translated to Chinese.
[03553] Safety loop fault has been detected, [03573] A safety loop fault is preventing normal operation
They are also available from the Translations page of this site.
04 Nov 2004: Select Thermal 2 procedures and troubleshooting translated to Chinese More...
Three procedures and two troubleshooting items have been translated to Chinese.
They are also available from the Translations page of this site.
TechPlanet CD Version 3 N.3—30 Sep 2004
21 Sep 2004: New global Exposure Head Request (EHR) form More...
Make sure that you complete an EHR form for every head that you replace. The form has been simplified to make it easier for you to complete and submit. The following changes were made:
Note: It is mandatory that you complete all the fields on the form.
It is essential that you record the laser on time hours of the head that is being replaced. You can only do this before you replace the head. You must have the device turned on. Use the commands:
>> laser
>>ldd info
This information is used for tracking head lifetime, and may be used to set head warranties and customer expectations in the future.
Download the new EHR form here: Exposure head request (EHR) form, or on the Parts/Tools page of the Thermal 1.x or Thermal 2 TechPlanet sites (under Ordering Information).
14 Sep 2004: When you troubleshoot banding, always clean the final window first More...
When the window on a TH2 head gets dirty, sudden, inexplicable banding can result. Therefore, cleaning the window is your first step when you troubleshoot banding.
The final window can be affected by:
For a detailed cleaning procedure see Thermal 2 Window Cleaning Procedure. For more details see Lens Cleaning FAQ.
14 Sep 2004: When on site check the air supply for oil More...
Oil in the air supply can seriously impact imaging quality by contaminating the final window. It may also reduce the life of the head by contaminating the optical cavity via the naphion line.
If you find a site or device that has a problem with oil in the line:
03 Aug 2004: Thermal head experts authorized for head replacements More...
In order to maximize head life, please consult with a thermal head expert before ordering a replacement thermal head. Field and Response Center Specialists have the latest information and troubleshooting techniques to assist you in diagnosing and optimizing a thermal head to keep it operational, or to confirm that it will need replacement.
The RC Resource Planning Group (RPG) (CAM: 1-877-788-2727) can put you in contact with a specialist, or refer to the list: Thermal head experts authorized for head replacements. This is also available from the Escalation page, under See Also.
22 Jul 2004: New! Troubleshooting thermal 2 focus errors More...
Four new documents have been posted that will help you to troubleshoot focus errors on a thermal 2 head. For more detail, follow the links below:
set med [x] focusmode, set med [x] focuslasermode, set foc actmode, set med [x] sd, and set foc offset).These documents are also available from the Troubleshooting page of this site.
TechPlanet CD Version 3 N.214 Jun 2004
10 Jun 2004: New Thermal Head naming convention More...
As of May 21st 2004, each TH2 head that passes through Production (new and RMA) will have an NVS field parameter called sys comment, which is populated with the part number and description of the head. This will help you identify the head when troubleshooting or ordering a replacement. This process will start with Thermal 2 heads, but a similar method will be implemented for TH1.x at the next firmware release.
The naming scheme consists of:
Part number | THgeneration.diode indicator | resolution | channels | screening criteria and proofing descriptor
For full details, refer to Invalid Key, which is also available from the Reference page of this site.
25 May 2004: TH2.5 Part Numbers Released More...
The part numbers for Thermal Exposure Head 2.5 are:
For more detail refer to the Overview page of this site.
27 Apr 2004: TH2 Head Installation Procedure for TS NEWS Updated More...
The TH2 Installation Procedure for Trendsetter Platesetters has been revised with new information on setting the focus basethickness parameter and determining target error value during the head positioning procedure.
Note: If the thickness of the plate used to position the head is less than 305 microns (the maximum plate thickness supported by TS NEWS devices), the error value displayed during a head install on command should not be zero. Rather, it should be the difference between 305 and the thickness of plate used for positioning the head.
Posted on the Installation page of this site and the Trendsetter NEWS site.
22 Apr 2004: New method for cleaning the final window on a Thermal 2 head More...
When you clean the final window on a TH2 head, use the cloths included in the window cleaning kit (part number 04-0012B).
For full details on the new method, download the procedure: Thermal 2 Window Cleaning Procedure.
The document is also available from the Procedures page of this site.
22 Apr 2004: Measuring the humidity level inside a Thermal 2 Head More...
Thermal 2 heads do not generate any humidity-related error messages. If the humidity in the head is too high the head will continue to function until it fails (due to, for example, an electrical short).
The humidity measured in the head is expressed in Volts, so you need to calculate the relative humidity inside the head. To calculate and interpret the relative humidity inside a TH2 head, use the following document: Measuring the humidity level inside a Thermal 2 Head.
The document is also available from the Procedures page of this site.
20 Apr 2004: Checking TH2 parameters using parmcheck.spt More...
When troubleshooting a possible head problem, you should first verify that the values of the head parameters are within the normal range. When you run parmcheck.spt, all the parameters are checked automatically.
Use parmcheck.spt to check the head parameters:
For full details on running and interpreting this script, download the procedure: Checking TH2 parameters using parmcheck.spt. It is also available from the Procedures page of this site.
06 Apr 2004: REMINDER: Use the correct procedure when testing the shutter More...
When you test the shutter on a Thermal 2 head, you must follow all the steps in the procedure. If you do not, the sensor will not be properly configured and your test results will be incorrect.
Download the procedure here: Testing the shutter on a thermal 2 head or from the Procedures page of this site.
01 Mar 2004: Attention! New Thermal 2 Firmware Released for All Platforms More...
Recently, the supplier for the TH2 focus diode was replaced. The new diode is functionally equivalent, however, due to more efficient operation, the new diode requires a small change to the TH2 firmware.
All active TH2 firmware versions have been patched, so that they will work with both old and new focus diodes. The old and new firmware versions are functionally equivalent, and the fix for the new diode does not cause any changes in firmware operation.
The firmware version changes are:
| Old version | New version |
|---|---|
| 1.01h | 1.01i |
| 1.02 | 1.02b |
| 1.03b | 1.03c |
| 1.04c | 1.04d |
Note: Using the old versions of firmware can cause TH2 error 1330: Focus laser not turning on. If you see this error message on heads running V1.01h, V1.02, V1.03b, or V1.04c, the solution is to upgrade to the replacement version of TH2 firmware.
Download the latest versions from the Firmware page.
01 Mar 2004: When to use the focus parameter BaseThickness More...
BaseThickness is an MCE-based parameter located in the FOCUS subsystem. It is used on Trendsetter NEWS devices to determine if multiple instances of media are loaded in the same spot on the drum (double-picking).
Lotem Quantum devices do not use this parameter.
For information on how to set BaseThickness on Trendsetter News, refer to the following excerpt from the Trendsetter NEWS MCE firmware release notes:
Thermal Head 2 Install Procedure and Basethickness Parameter Setup
Proper use of the moving lens range is a basic requirement for host products to allow room for any bump tracking.
The head install procedure ensures that any plate thickness allowed by the product specification will work properly and have room for any bump tracking. NEWS devices support plates with thickness 0.2 to 0.3 mm. The head should be installed with an average error of 100 microns and the basethickness set to 305 if the plate loaded during the install is 205 microns thick. For example, if the head is installed to an error of +100 using a 205 micron thick plate, and then a 305 micron plate is loaded, there still will be 150 microns for plate bump tracking. In other words, one should NOT always do head install to 0 error.
The constraint is the equation: “BaseThickness” - “Thickness used to install head” equals “The error head was installed to”. Choose a BaseThickness value that is the maximum of the different thicknesses that are expected to be used. The head install procedure is as follows:
01 Mar 2004: TH2 Troubleshooting: when stroke cal fails and hvtrim has a value of 0 More...
This occurs when the script contrastvhv.spt fails or is aborted. The script changes the hvtrim parameter to 0, and this causes stroke cal to fail. This problem may be confused with a case where the shutter is stuck open.
For a detailed solution, refer to the following troubleshooting item : Stroke cal fails and hvtrim has a value of 0.
27 Feb 2004: Updated! Troubleshooting Staccato On-Plate More...
The following sections in this troubleshooting document have been updated:
Download the latest: Troubleshooting Staccato On-Plate. This is also available from the Staccato site.
20 Feb 2004: Thermal 2 Head Firmware Version 1.03b Released More...
Thermal 2 head firmware version 1.03b has been released, and is available on the TechPlanet Firmware page. This firmware is part of the controlled release process, and should only be installed on devices that support it. To find out which devices support V1.03b firmware, refer to the controlled releases page on TechPlanet.
V1.03b contains only minor changes from V1.02. Please refer to V1.02 documentation if upgrading from V1.01h or earlier to V1.03b. Full regression testing is not required.
The main changes in V1.03b include:
swidth, soffset, swidthn, and soffsetn from the HEAD parameter block, to the HDM parameter block. This allows you to use media with different stroke settings on the same head.For full details, refer to the V1.03b release notes.
TechPlanet CD Version 3 N.1/16 Feb 2004
16 Feb 2004: New! Thermal 2 Head Planned Maintenance Procedure More...
The Thermal 2 Planned Maintenance procedure has been published. Complete a head Planned Maintenance any time you do a device Planned Maintenance (recommended every 6 months).
For full details, refer to the Planned Maintenance procedure, available from the Maintenance page of this site.
09 Feb 2004: Updated procedure: Draining the Coolant from a Thermal 2 head More...
Please download the latest version: Draining the Coolant from a TH1 or TH2 Head
Reminder: This procedure requires the coolant draining kit (50-2465A BOM). This kit is shipped with every replacement head, and can be reused.
09 Feb 2004: Thermal 2 Debris Removal Nozzle Cleaning Procedure has been updated More...
Please download the latest version: Thermal 2 Debris Removal Nozzle Cleaning Procedure
03 Feb 2004: Emissions and Ventilation FAQs More...
Frequently-asked questions (FAQs) about emissions and ventilation related to imaging of thermal media have been compiled. The document is intended for both Creoites (sales and service) and customers.
Download the FAQ here: FAQ: Emissions and ventilation related to imaging of thermal media or from the Debris Removal Reference page.
16 Jan 2004: Troubleshooting the TH2 error 'Beam-Balance: The beam-balance sensor shutter could not be closed' on Trendsetter NEWS 200 More...
There is a bug in Trendsetter NEWS MCE controlled release V2.3 that causes the Thermal 2 head error [00221] Beam-Balance: The beam-balance sensor shutter could not be closed to be generated. A workaround is available: TH2 error [00221] occurs on Trendsetter NEWS 200 with MCE controlled release V2.3.
Note that the workaround does not apply to Panorama plates larger than 885mm.
This troubleshooting item is available form the Troubleshooting page of the Trendsetter NEWS site.
12 Jan 2004: Updated procedure: Testing the Shutter (was How to check the shutter) More...
This procedure has been updated to include more detailed diagnostic information.
Download this document here: Testing the shutter on a thermal 2 head or from the Procedures page of this site.
08 Jan 2004: Troubleshooting TH2 Temperature and Pump Failure Problems on a Lotem 800 Quantum More...
This relates to the following errors on a Lotem Quantum:
[02321] Laser Diode: The laser diode is over-temperature ( WLP fault )[02325] Laser Diode: Possible coolant failure ( WLP fault )[02323] Laser Diode: The temperature sensor is open-circuit ( WLP fault )[02319] Laser Diode: The laser diode is over-temperatureIf you have any of these errors, or when you use the command ldd info to check the temperature of the diode, you see the line laser temperature not available 0 C, refer to the new troubleshooting item: Troubleshooting Th2 temperature or coolant failure problems on a Lotem 800 Quantum
This is also available on the Troubleshooting page of this site.
07 Jan 2004: New TH2 Troubleshooting and Media Course Now Available More...
This 5-day course provides a guided learning experience to enable quick and efficient troubleshooting of TH2 and media problems.
It integrates materials taken from the related TH2 Advanced Troubleshooting Course and the Thermal Media & Staccato Workshop. The materials were re-worked to provide a course that delivers training targeted at troubleshooting common problems starting with the symptom and guiding the student through the troubleshooting process to find the solution.
The course is intended for Creo Customer Service Engineers who have taken the Lotem Quantum training class, but who do not possess extensive experience in solving Thermal head and media problems.
The first offering is scheduled for Feb 23 to 27 in Vancouver. The course will be offered in CEM within a few months. For full details, go to the Learning Center (http://learningcenter.creo.com) and search the catalog for TH2 troubleshooting and media.
10 Dec 2003: Power Monitor Parameter on Newspaper Devices with TH2 and MPE More...
If you install a TH2 head in a Newspaper machine with MPE, please disable the power monitor parameter. Normally all TH2 heads leave the factory floor with the power monitor parameter set to true, but the MPE does not support this feature.
The following error message may appear while you're plotting:
[02318] laser diode: the laser power could not be calculated during calibration
If this occurs, use the related troubleshooting item for a solution. This has been posted to the Troubleshooting page of this site under the keyword power calibration.
09 Dec 2003: Thermal 2 1016 and 1270 DPI Heads Released to Early Production More...
To meet the demands of the Newspaper market, Creo is manufacturing TH2 heads with resolutions of 1016 and 1270 dpi. These heads have been released to Early Production.
For more information, download the FAQ: Thermal 2 1016 and 1270 DPI Imaging Heads, also available from the Overview page of this site.
09 Dec 2003: New versions of two Thermal 2 scripts posted More...
Two Thermal 2 scripts, currentping.spt and forceping.spt, have been updated. These scripts are dpi-dependent, and had to be updated to include the new 1270 and 1016 dpi heads. These scripts have been tested for use with Service Shell 2.5.
Download the new versions of the scripts here: Invalid Key, Invalid Key, or on the Downloads page of the Splot TechPlanet site.
Note: currentping.spt and forceping.spt are used only when the head is built or when re-pinging the actuator. This is not a common procedure and we do not expect the average field engineer will have to use these scripts.
The 1270 and 1016 dpi heads have been released to Early Production. For more information, refer to the Overview page of this site.
03 Nov 2003: Updated: WLP safety, burst data not available [errors 02327 and 02330]: What heads might be affected? More...
The following document has been updated to include information on what heads may be affected by this problem.
To summarize:
If you suspect that the head you’re working on has this problem, follow the procedure included in the document
For full details, download: Troubleshooting WLP burst errors. This document is also available from the Troubleshooting page of this site.
03 Nov 2003: Two new LDD calibrate documents have been released More...
Two new documents about LDD calibrate have been released. Download the following:
Both documents are also available from the Troubleshooting page of this site.
03 Nov 2003: Document Updates More...
Two documents have been updated. They now have a more up-to-date diagram of the Thermal 2 voltage and safety lines.
30 Oct 2003: New Training Materials Have Been Posted More...
Several Powerpoint presentations have been posted to the Reference page of this site. They are also available on the Troubleshooting page, under their associated keywords. Download the following:
29 Sep 2003: Always check the head tilt when troubleshooting imaging problems or installing a new head More...
Accuracy of tilt is critical for FM jobs. When you’re installing a head or when you’re diagnosing banding on-plate, make sure that you check the tilt and adjust it if necessary.
To check the tilt (all thermal heads):
Refer to the Thermal 1 or 1.7 installation procedure for details:
Note: Tilt is not adjustable on Thermal 2 heads. Contact your regional specialist if you find a tilt problem on a Thermal 2 head. See the related troubleshooting item.23 Sep 2003: How to repack a TH2 head for shipping More...
A new procedure has been posted that describes how to correctly repack a Thermal 2 head for shipping.
Note that you must always drain the coolant from a head before you pack and ship it. Refer to the following procedures for details:
TechPlanet CD Version 2 N.3/415 Sept 2003
15 Sep 2003: New Media Setup Procedure and Staccato Troubleshooting Guide More...
New procedures have been written for setting up media, and for troubleshooting Staccato® on-plate. For full details, refer to this week's Product Support Newsletter.
25 Aug 2003: Download the Latest Version of Thermal 2 Splot Installer and Scripts More...
Install the latest version of Splot and the latest Thermal 2 scripts using the installers available on the Splot Downloads page. Refer to the Splot home page for further details.
Note: You must upgrade to the latest version of Splot (V3.64) in order to properly run the updated scripts.
11 Aug 2003: New Installation Procedure for TH2 on a Trendsetter NEWS More...
A new procedure has been posted that describes how to install a TH2 head in a Trendsetter NEWS device.
Download the document here: TH2 Installation Procedure for Trendsetter Platesetters, or from the Installation page of this site. For full information on device installation refer to Trendsetter NEWS Installation.
24 Jul 2003: New! Cleaning Kit for the Final Window More...
It is important to ensure that the final window is clean before swapping out a head because debris build-up can cause a serious reduction in both image quality and power output from the head. A high percentage of heads returned with image quality issues have not had the final window cleaned, and this costs Creo unnecessary money.
A new window/lens cleaning kit (Lens cleaning kit: 04-0012B BOM) is now available that will make lens cleaning easier. It includes:
Ordering tip: Because of the relatively high cost of shipping this kit, it is most cost-effective to order the kit in multiples of three.
Refer to the Lens Cleaning FAQ for more information. Also, make sure you download the latest Thermal 2 Window Cleaning Procedure.
02 Jul 2003: New! TH2 Troubleshooting by Error Code/Subsystem More...
A new listing of how to troubleshoot specific error codes has been compiled. By simply knowing the error code or the description of the error, you can now search for troubleshooting information on common errors using the new Troubleshooting by error/subsystem Index.
As well as searching by error code, you also have the option of searching by sub-system. The troubleshooting information includes a brief description of what to try as well as links to the appropriate documents and procedures.
You can also access this index from the Troubleshooting page, under Error codes.
02 Jul 2003: scnarrow.spt and soffsetn.spt are no longer required for setting up Staccato More...
The two scripts scnarrow.spt and soffsetn.spt are no longer required when setting up Staccato. They are listed on the Downloads page for archive purposes only.
For further details, refer to: Troubleshooting Staccato On-Plate
23 Jun 2003: Legacy Head Part Numbers Posted More...
Legacy part numbers for Quantum (P22) and Creo Imaging (P33) heads have been posted.
For further details, refer to: Heads By Part Number.
12 Jun 2003: When installing or replacing a Th2 head, check that the Z-rod properly engages the TH2 Indexing Rod More...
If the Z-rod is not fully engaging the TH2 Indexing Rod, the error will saturate when moving the Z-stage back during head install on, or the Z-rod may break. There are some rare cases where, due to the tolerances of both the Z-rod and the threaded hole in the Th2 Indexing Rod, this error may occur. This can occur anytime you are installing a Thermal 2 head.
Solution: In all cases where a TH2 head is being installed or replaced, check that the Z-rod is properly engaging the TH2 Indexing Rod.
For the detailed procedure, refer to this troubleshooting item: Error saturates when moving the Z-stage back during head install on or the Z-rod breaks.. This is also available o nthe Troubleshooting page under Installation.10 Jun 2003: Ordering Heads Using the EHR Form More...
When ordering a thermal head, make sure you fill out the EHR form completely, including a detailed description of the problem, the number of hours on the head, and the level of Staccato® the customer is using (if applicable).
Also, please be sure to consult a Thermal PSS (or another authorizing engineer, if a PSS is unavailable) before deciding to replace the head.
In cases where the problem is due to imaging artifacts, always include a plate or proof sample, and, when applicable, a Press sheet sample with the shipment.
Providing as much information as possible saves valuable time when the order is processed and increases the likelihood of us finding the cause of the failure. The future success of this product relies on the information that you provide us today.
Download the latest form here: Exposure Head Request Form.
21 May 2003: New Escalation Process for Head-Related Problems More...
The Thermal head escalation page on the TechPlanet has been updated. This includes:
These changes have been made in coordination with the revisions to the global escalation procedure.
Please note that the changes are not meant to deter field support staff from contacting PD support staff if they are unable to get assistance within their CSC. If you require an answer to question to facilitate better and faster service to our customers, then you should contact whatever resources are at your disposal to get that answer quickly. However, if you require a product fix or a significant amount of time from a PD resource, a formal escalation will be required.
Refer to the Escalation page for more details.
05 May 2003: Updated: Th2 vs Th1.x Monitor Commands and NVS Parameters More...
This document compares Thermal 2 and Thermal 1.x monitor commands and NVS parameters. It has been updated to reflect the NVS parameters and monitor commands that are supported by Thermal 2 firmware version 1.02+ based on Thermal 1.0 / 1.7x firmware version 1.90.
Download the document Th2 vs Th1.x Monitor Commands and NVS Parameters, or find it on the Reference page of this web site.
05 May 2003: Th2 Firmware Version 1.02 Released More...
Head firmware version 1.02 has been posted. It is available on the Firmware Release page. It is also available from the Downloads page of this site.
Note: It is no longer recommended to simply download the latest version of firmware. Rather, upgrade all components to a controlled release version.
The following items were implemented:
TechPlanet CD Version 2 N.228 Apr 2003
31 Mar 2003: Th2 Focus System Training Materials Now Posted More...
The Thermal 2 Focus System training materials are now available on TechPlanet. Download these two powerpoint presentations from the Reference page of this site.
Note that these presentations will be periodically updated.
31 Mar 2003: Thermal 2 Factory Settings More...
The Thermal 2 factory settings are now available on TechPlanet. Make sure that you always refer to the highest numbered NVSDump sub-directory for the most up-to-date settings.
View them via the Control/Settings page,or directly via the Thermal 2 Config Files.
18 Feb 2003: IMPORTANT: Safety Loop Faults and WLP burst error More...
If any of the following errors appear:
Refer to the following procedure: Safety faults and WLP burst error
18 Feb 2003: How to Find the Correct Drum Position for Edge Detection (Lotem Quantum) More...
For more information on finding the correct drum position, refer to the following:
05 Feb 2003: New Technical Bulletin: Do not use wpowern when setting up Staccato on a Th2 head More...
The information published in the Jan 10 PSN has ben captured as a techncial bulletin: Do Not Use wpowern when setting up Staccato on a Thermal 2 Head.
It has been posted to the Reference page, as well as to the Troubleshooting page, under Staccato.
31 Jan 2003: Pixel Chopping Calculator has been updated More...
Make sure you download the latest version of the pixel chopper. Download it here: Pixel Chopping Calculator or from the Troubleshooting page of this site.
27 Jan 2003: Setup and Tuning for Staccato: Updated Procedure More...
The Troubleshooting Staccato On-Plate document has been updated to include more explanation on the differences between AM and FM screens, and to provide instructions for MCE- and MPE-based devices.
Download it from the Procedures page of this site.
TechPlanet CD Version 2 N.124 Jan 2003
16 Jan 2003: Power calibration error message appears when plotting More...
If the following error messages appears while you're plotting: [02318] laser diode: the laser power could not be calculated during calibration , refer to the related troubleshooting item for a solution. This has been posted to the Troubleshooting page of this site.
16 Jan 2003: Head Part Numbers Now Posted More...
The Thermal 2 head part numbers have been posted to the Parts/tools page of this site.
09 Jan 2003: Do not use wpowern when setting up Staccato on a Thermal 2 head More...
When setting up Staccato with a Thermal 2 head, do not use the parameter wpowern (narrow mode power). This applies to all Thermal 2 heads that are being set up for Staccato.
Background
Unlike Thermal 1.7 heads, Thermal 2 heads do not need to use narrow mode. Therefore you should not use wpowern (power setting for narrow mode), even though this parameter still appears in the host (MPE and MCE) under hdm (head dependant media).
In older versions of MPE and MCE (including MCE version 1.20), if you change the wpowern parameter, the Thermal 2 head will use this power value. If this power value is incorrect, it can cause problems such as banding, or problems setting up the media.
In more recent versions of the MPE this problem will not occur, since changing wpower will immediately upgrade wpowern (narrow mode power).
For further information, contact Kyle Good.
09 Jan 2003: Do you clean the final window correctly? More...
The surface of the final window is extremely sensitive. Improper cleaning and handling can permanently damage the lens.
Make sure you follow the correct cleaning procedure, as described in the Thermal 2 Window Cleaning Procedure, available from the Procedures page.
Key cleaning steps:
07 Jan 2003: UPDATE: Error on the Lotem Quantum: 5230 buffer overflow More...
This troubleshooting
item provides commands for disabling verbose. Find it under Error/System
Messages on the Lotem 800 Quantum Troubleshooting page.
07 Jan 2003: Accessing thermal 2 head parameters in MCE More...
Accessing thermal 2 head parameters in MCE: Access thermal 2 head parameters using a new command syntax. Find this item on the Lotem 800 Quantum Troubleshooting page under firmware.
27 Nov 2002: How to connect remotely to a device with a Thermal 2 head and Brisque or Prinergy More...
A new procedure has been posted that details how to connect remotely to a device with a Th2 head and Brisque or Prinergy. Refer to the following documents:
- Invalid Key
- Invalid Key
Find both procedures on the Procedures page.
22 Nov 2002: Error on the Lotem Quantum: 5230 buffer overflow More...
In some cases this error may occur because vbs (verbose) is enabled. If this is the case, disable verbose using the following commands:
QUANTUM>> redirect enable
TH2>> vbs list
This will show you if any subsystems are vbs-enabled. If they are, type:
TH2>> vbs disable all
QUANTUM>> redirect disable
The underlying cause of this behavior is being investigated. For further information about this issue contact Iris Mordan.
04 Nov 2002: How to create series with workstation plots More...
Refer to the following procedure: Creating Series with Workstation Plots, or download it from the Troubleshooting page.
TechPlanet CD Version 1 N.426 Oct 2002
24 Oct 2002: New Staccato Troubleshooting Tips More...
For tips on how to troubleshoot Staccato, refer to the following document: Troubleshooting Staccato On-Plate, or download it from the Troubleshooting page.
24 Oct 2002: P33 Thermal Imaging Head Released More...
The P33 Creo Thermal Imaging head replaces the discontinued Entry Imaging head. P33 heads are available in both Thermal 1.x and Thermal 2 formats. All Entry Imaging heads have already been upgraded.
03 Oct 2002: New! TH2 Troubleshooting Flowchart More...
A new troubleshooting flowchart has been posted to the Thermal 2 Troubleshooting page, along with several new troubleshooting-related procedures. Use the flowchart to guide you through troubleshooting a TH2 head.
Note that the content is still under development. If you're looking for information that is not yet in the flowchart, please contact Kyle Good.
19 Aug 2002: New Procedure Posted: Th2 Debris Removal Nozzle Installation More...
For details on installing a debris removal nozzle on a Th2 head, download the following document: TH2 Debris Removal Nozzle Installation Guide , or find it on the Installation page of this web site.
01 Aug 2002: Th2 vs Th1.x Monitor Commands and NVS Parameters More...
A new reference document has been posted that compares Thermal 2 and Thermal 1.x monitor commands and NVS parameters. Download the document Th2 vs Th1.x Monitor Commands and NVS Parameters , or find it on the Reference page of this web site.
TechPlanet CD Version 1 N.2/312 Jul 2002
02 Jul 2002: Controlled Releases and Thermal 2 More...
The first Controlled Release CDs are now available for a number of output devices. A Controlled Release is a package of software/firmware components that have been tested for compatibility with each other and with the device hardware. All machines should be upgraded to the latest controlled release version according to the priority of the controlled release ECO. Thermal 2 firmware is included in the controlled release for Trendsetter NEWS. For details, refer to the Control/Settings page of the All CTP Devices website.
18 Jun 2002: Latest Th2 Scripts and Splot Posted to the Splot Site More...
Refer to this week's Product Support News or the Splot Homepage for more detail.
Note: You must upgrade to the latest version of Splot (V3.64) in order to properly run the updated scripts.
18 Jun 2002: EH.PWR Signal Not Available on All Thermal 2 Heads More...
Although the EH.PWR signal is present on all heads produced now, there are several hundred in the field that do not have this signal. On some systems, the absence of this signal will cause a flag, such as Exposure Head Power, to be asserted. This flag should be masked.
Refer to the new troubleshooting item for more information.
17 Jun 2002: Whisker Jets No Longer Shipped with Thermal 2 Heads More...
Thermal 2 heads will no longer be shipped with a whisker jet. All replacement 1200 dpi heads now have a label reminding the Field Service Engineer to reuse the whisker jet from the old head.
Note: New 1200 dpi NEWS heads will have the whisker jet installed during integration (2540 dpi and 2400 dpi heads use the debris removal nozzle and do not need a whisker jet).
27 May 2002: Th2 Command nvs dump diff produces error message 'Invalid Parameter' More...
A new troubleshooting procedure has been posted to the Lotem Quantum site: Th2 Command nvs dump diff produces error message 'Invalid Parameter'. Use the command QUANTUM>>prm diff instead for devices using MCE firmware version 1.20.03 and later. Follow this link, or find it at the Thermal 2 Troubleshooting page.
15 May 2002: Coolant Draining Kit Included With Every Thermal 2 Head Shipment More...
The head draining kit (PN 50-2465A) is now included with every thermal 2 head shipment. Keep this reusable kit either with the head or in your tool kit. Note that these kits can also be used to drain Thermal 1.x heads.
Remember that you must always drain the coolant from the head prior to shipping. Refer to the Draining the Coolant from a TH1 or TH2 Head procedure for more information.
15 May 2002: Caution! Wear a Static Strap When Handling Thermal Heads More...
Electro Static Discharge (ESD) has been responsible for an increasing number of preventable head failures. You must ensure that you are properly grounded when handling thermal heads, power supplies, or any of the electronics in the devices. Also, you must have your static straps periodically tested or replaced to ensure they are functioning properly. Remember that the effects of ESD are not always immediate and are not detectable until the failure occurs.
It is important to guard against ESD when removing failed heads because these heads are sent for repair and refurbishment and are eventually sent back into production. Many of the problems that these heads can experience are a result of previous damage from improper handling.
Always ensure that you are properly grounded when handling thermal heads, power supplies, or any of the electronics in the devices.
03 May 2002: ECO E751: Firmware Version 1.01f Released More...
Firmware version 1.01f has been posted. Refer to the Downloads page for more information, or download it directly from the Firmware Release page. Refer to the release notes for more information.
22 Apr 2002: Where to Find Splot and Service Shell on TechPlanet More...
Note that Splot has been relocated to: TechPlanet Home>Output>Service Tools>Splot. Make sure you update your bookmarks! See also Where to find Splot and Service Shell
27 Mar 2002: Thermal 2 Performance Specifications Posted More...
Performance specifications for 1200dpi, 2400/2540dpi, and 3200dpi have been posted to the Overview page. Note that these are for internal use only and are not suitable for release to external customers.
Technical Library CD Version 1.115 Feb 2002
14 Feb 2002: Firmware Version 1.01c Released More...
Firmware version 1.01c has been posted to the TechPlanet. Download it from the Firmware section of the Downloads page.
CAUTION: This release must not be used with heads that have Control Board 2 (use the >>ver command to determine the head's board number). Refer to today's PSU (Vol.6 No.3) for more detail.
21 Jan 2002: Th2 and Quantum MCE Simulators More...
Two new simulators have been posted to the Downloads page.
15 Jan 2002:Where to find Splot and Service Shell More...
09 Jan 2002: New Navigational Structure More...
This site has been restructured to fit TechPlanets common navigation. Please take a few moments to familiarize yourself with the new structure. If you have any questions or comments about the navigation, please email Dina Davidson.
23 Oct 2001: How to Upgrade Firmware in a Lotem Quantum More...
A new procedure has been posted that describes how to upgrade firmware on a Lotem Quantum using Service Shell. Download the following procedure: Invalid Key), available from the Procedures page.
22 Oct 2001: Splot 3.34d Upgrade Posted
Splot 3.34d provides improvements in remote data transfer from the head when troubleshooting remotely. Note that if you have Service Shell installed, you must upgrade Splot to the latest version. To upgrade to version 3.34d, download the following procedure:
TEH II Splot 3.34d Upgrade Procedure), available from the Splot page.
22 Oct 2001: Splot Downloads Now Available
Follow the link to the Splot Home Page. From there you can download the latest Splot Installer, Installation Guide, and Upgrade, as well as the latest ServiceShell Downloads.
18 Oct 2001: Must Read: Draining the Coolant from a Thermal 2 head
The coolant inside the head may freeze during transport, which causes internal leaks and cracks in the head cooling system. In order to avoid this, you must drain the coolant from the head prior to shipping or storing. The kit (part number 50-2465A) and procedure are now available.
Download available from the Procedures page.
18 Oct 2001: New Procedure: Removing the Thermal 2 head from a Lotem Quantum
This procedure is for any Field Service Engineer who services the Lotem Quantum. It is necessary to remove the head whenever you clean the window, the debris removal nozzle, or otherwise service the head.
Download it from the Procedures page.
26 Sep 2001: TH2 Firmware Version 1.00d released
Refer to the Downloads page for more information.
11 Sep 2001: TH2 Firmware Version 1.00c released
Refer to the Downloads page for more information.
For older news items please refer to previous versions of the Technical Library CDs.